3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.50 LPA
Must be Good knowledge of Mould Loading Unloding
Production Process
To control the various parameter of Moulding Machine.
To control the various problem in Moulding part.
Manpower handle and production planning.
Maintain 3R on shop floor
Maintain 5s activities.
Mould unload/loading.
Maintain 4M on shop floor.
Root cause analysis & problem solving of defects such as short shots, flash, ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 4.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 1.0 Year(s)
1.00 LPA TO 2.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 8.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 1.0 Year(s)
1.00 LPA TO 4.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.00 LPA TO 4.00 LPA
Experience Diploma or BE Mechanical
knowledge for Manufacturing Process, Engineering concepts should be clear.
must have experience in working on shop floor.
Achieving desired Productivity targets within target rejection percentage.
Reducing number Of manpower by going for automation and other Lean techniques.
Reduce production cost and batch time
Daily Production Report
Capacity analysis
Daily Machine Check Record
Material Consumption ...