1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
"Lead and provide technical direction to the team and responsibility for efficient and reliable maintenance of Electrical systems.
Provide technical direction to trade/craft and engineers.
" Exposure of overhaul and general maintenance of following equipment's / sub system of power plants :
Generator, UAT / ST and Generator transformer, Plant Aux equipment's like ...
1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
20.00 LPA TO 22.00 LPA
Lead Engineer - Mechanical Component:
Pre-screening criteria:
Qualification
Master’s in mechanical/aerospace engineering à minimum 4 years experience
Bachelors in mechanical/aerospace engineering à minimum 6 years experience
Targeted Industry
Preferred in Aero engine or Turbo machinery or automobile industry
Skill set
Finite element analysis (Stress, Vibration, LCF, HCF, Fracture mechanics, Creep, Buckling etc)
Mechanical design (GD&T, Stackups, Design reviews, DFMEA, Drawing etc)
Tools (Ansys, Hypermesh, ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
70.00 LPA TO 80.00 LPA
Job Title- Principal Data Engineer
We are building a rockstar team to help us push the frontiers of AI. Company AI Labs is bringing together the brightest talents in the world to integrate AI into the DNA of each business inside and outside ofCompany. With Company’s presence across Energy, Airport, Port & ...
1 Opening(s)
6.0 Year(s) To 12.0 Year(s)
20.00 LPA TO 30.00 LPA
Role Summary/Purpose:
As an Advanced Lead Engineer, you will build and utilize multiple skillsets including design, product definition and field issue resolutions for a specific hardware or group of hardware in LCE Engineering Org. You will be doing activities linked to technical improvement of existing components and products, resolution of ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.00 LPA
1. Key SLD, Protection & Metering SLD
2. Design Basis Reports
3. Sizing calculations / Equipment selection
4. System studies using ETAP
5. Protection, Synchronisation, Control & Metering scheme drawings of Generators, Transformers, Switchgear, Switchyard, Reactors and Lines
6. Networking architecture including IEC61850
7. Relay setting calculation and Parameterisation
8. Control interfaces with DDCMIS, EDMS, ECP
9. Cable ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 5.00 LPA
Objective: Develop and evaluate renewable (Wind/Solar) energy-related projects, manage the company’s existing portfolio of renewable energy projects installed at various sites and strive to improve energy efficiency and increase power generation from these projects. He shall be specializing in electrical machines, maintenance & repairs of electrical and mechanical equipment, ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
4.80 LPA TO 6.00 LPA
We are looking for Electrical HEAD for 8MW Power Plant at Bilaspur location.
"Lead and provide technical direction to the team and responsibility for efficient and reliable maintenance of Electrical systems.
Provide technical direction to trade/craft and engineers.
" Exposure of overhaul and general maintenance of following equipments / sub system of power ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
15.00 LPA TO 16.00 LPA
Preventive, Predictive and Break down Maintenance of 1 x 80 MW CFBC & 2 x 45 MW AFBC Thermal Power Plant, AHS, CHP, DM plant, WHRB’S.
? Planning, Estimating and Indenting of spare and other consumable items for overhauling of equipment’s.
? Co-ordinates with operation, project, electrical, instrumentation, civil, store, purchase and personnel dept.
? Setting goals, objectives, and strategy to achieve zero breakdowns and zero accidents.
? Maintaining ISO, spare parts development, modification, replacement history documentation.
? Daily Job ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
10.00 LPA TO 12.00 LPA
Preventive, Predictive and Break down Maintenance of 1 x 80 MW CFBC & 2 x 45 MW AFBC Thermal Power Plant, AHS, CHP, DM plant, WHRB’S.
? Planning, Estimating and Indenting of spare and other consumable items for overhauling of equipment’s.
? Co-ordinates with operation, project, electrical, instrumentation, civil, store, purchase and personnel dept.
? Setting goals, objectives, and strategy to achieve zero breakdowns and zero accidents.
? Maintaining ISO, spare parts development, modification, replacement history documentation.
? Daily Job ...