10 Opening(s)
5.0 Year(s) To 8.0 Year(s)
2.40 LPA TO 3.00 LPA
Job Profile:
Maintenance of galvanizing line.
Maintenance of Maintenance of D.C. machines (up to 1600 KW DC motor.)
Maintenance of Maintenance of A.C motor (2500 KW AC motor.)
Maintenance of DC & AC Drives, power & auxiliary panels.
Maintenance of roll grinding machine
Attending Breakdown maintenance & shutdown maintenance.
Maintaining Safety aspects & House Keeping of the line.
Maintenance of crane.
Making technical Specifications and technology appraisal for plant equipment and utilities.
Maintenance of Ac Drive, Dc Drive like ABB, Allen Bradley, Siemens micro Master Drive, Tele mechanique Drive
BRM & WRM Electrical Maintenance
Successfully completed BAR MILL Project
Erection & commissioning of MCC,PCC, Transformers Drives
Control wiring from RIO to Field - Proxy, HMD and solenoid valves..
Did the communication wiring & Control wiring.
MCC Control wiring & RIO'S Termination & Cabling
AC motors installation & maintenance.
Encoders Cabling & Termination
OS Internal/External wiring
Wiring of Siemens PLC S7-400
Handled wiring of field devices like control valves, flow meters.
Looked after power cable laying & termination for power distribution panels (PCC & MCC), motors, transformers, Ac drives and HT panels. And control cables for PLC, RIO'S and various field equipment
Coordinated with SIEMENS & MORGAN for Commissioning of Bar Rod Mill
Hydraulic and Lubrications motor maintenance
EOT cranes & Magnetic cranes, Electrical maintenance & Troubleshooting
Job Location: Chitegaon MIDC, Aurangabad Maharashtra
For more details call on 7249840333 / 9765567506
Send CV on career@paradiseplacement.co.in
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
1.80 LPA TO 3.60 LPA
Post: Maintenance Engineer or Senior Engineer
1. Mechanical Maintenance Engineer 01
2. Electrical Maintenance Engineer 02
Experience: 2 to 7 Years
Salary: 3.60 LPA
JOB RESPONSIBILITIES:-
Attending all breakdowns of machines, Equipment & its Rectification
Handling & Maintenance of Air Compressor, Electrical Motors, Transformers, ACB
Maintenance of Forging machines(1T,2T,3T,5T,8T, LASCO Belt drop), Forging Press(400 Ton, 500 Ton, 600 Ton), Cutting m/c.
Handling breakdowns of Shot blasting m/c, Magnaflux m/c, Heavy Grinder, Heat Treatment Furnace (Oil & Induction), LT & Ht Panel.
Preventive Maintenance of all machines as per PM Schedule, Maintain history card & maintenance related data of Machine.
Control Panel wiring, Maintain unity P.f. of the plant.
Calculating MTTR, MTBF, Control the spares consumption.
Knowledge of MCC Panel, PCC Panel & APFC Panel, PLC, PNP sensors
Ensure availability of spare parts required for maintenance and raising PR
Induction Billet Heater [Ibh] Coils Connection
Robot Connectors And Working Trial
Hoists Maintenance
Replacing Faulty Limit Switches, Proxy PNP Sensors
During Servicing Of Transformers Set Up Work And Dg Sets
DM Water Plant, Cooling Towers
Motors Connections During Changing Motors
Heat Treatment Plant/Thermocouple
Taking Daily Readings Of Air Circuit Breaker, Vaccum Circuit Breaker, Ibh, Heat Treatment Plant And 33kv Ht Yard
Job Location: Waluj MIDC, Aurangabad
Send CV on Career@paradiseplacement.co.in
for more details call on 9765567505
2 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.20 LPA TO 1.60 LPA
Key responsibilities
Installation: Install electrical systems, wiring, fixtures, and equipment in new and existing buildings.
Maintenance: Perform routine maintenance on electrical systems to prevent breakdowns and ensure continued functionality.
Repair and troubleshooting: Diagnose and repair electrical problems, often using testing devices to identify and fix malfunctions in components like circuit breakers, motors, and ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.50 LPA TO 3.50 LPA
Key Responsibilities:
Maintenance & Repair: Perform preventative and corrective maintenance on motors, generators, switchgear, transformers, control systems, and lighting.
Troubleshooting: Diagnose and fix faults in electrical equipment, PLCs, AC drives, and instrumentation using test equipment (voltmeters, thermal scanners).
Installation & Upgrades: Install, modify, and upgrade electrical systems, wiring, and control circuits.
Safety & Compliance: Strictly adhere to safety protocols ...
2 Opening(s)
2.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.00 LPA
1 To follow all safety rules and standards. Participate in safety tool box talk.Ensure compliance of SOP, work permit systems and environment care2 To ensure the use of job specific tools in good condition and tested 3 To do 5s activities in work place . 4 To attend class room ...
1 Opening(s)
4.0 Year(s) To 6.0 Year(s)
4.50 LPA TO 5.50 LPA
Position: Electrical Engineer
Location: Sarigam - Vapi
Experience: 3 - 4 Years
Industries: Chemical
Responsibilities:
To make and get approval plant wise preventive maintenance schedule for all equipments and ensure it implementation.
Identify and update minimum stock requirement for spares.
Raise requirement of other spares ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
50.00 LPA TO 70.00 LPA
Strategic Procurement Leadership: Developing and implementing long-term sourcing strategies for components like solar panels, inverters, wind turbines, transformers, and cables.
Vendor Management: Building and maintaining strong relationships with domestic and international suppliers, including those in China and Southeast Asia. This involves contract negotiation, performance tracking, and vendor development.
Logistics & Inventory Management: Overseeing multi-location warehousing, ...
2 Opening(s)
2.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.00 LPA
1 To follow all safety rules and standards. Participate in safety tool box talk.Ensure compliance of SOP, work permit systems and environment care2 To ensure the use of job specific tools in good condition and tested 3 To do 5s activities in work place . 4 To attend class room ...
1 Opening(s)
4.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 4.20 LPA
A Civil Engineer for the solar energy industry is responsible for the civil and structural aspects of solar projects, including site assessment, design, and construction oversight of foundations, grading, drainage, and access roads. Key duties involve creating technical drawings, collaborating with electrical engineers, ensuring compliance with regulations, and managing construction activities ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
12.00 LPA TO 17.00 LPA
Duties & Responsibilities:
Support design and development of high-voltage transformer bushings as per IEC/IS and customer specifications
Prepare and review 2D/3D electrical design drawings and schematics using CAD tools
Create and maintain design documentation including BOMs, test reports, and engineering calculations, and quality teams to resolve design-related issues
Provide engineering ...