1 Opening(s)
									 
									5.0 Year(s) To 7.0 Year(s)								
							
									 
									3.00 LPA TO 4.20 LPA								
							
									Requirement ELECTRICIAN For reputed Heavy engineering plant at raipur location
 
Responsible for preventive maintenance of all machines of various departments. 3. Responsible for operation of Utility machines in his shift. 4.Required ITI/NCVT passed Electrician with at least 1 to 5 years of experience with reputed Sponge iron. Candidate should have experience in LT/HT ... 
								
							1 Opening(s)
									 
									12.0 Year(s) To 15.0 Year(s)								
							
									 
									6.00 LPA TO 7.00 LPA								
							
									We are currently looking for lab head sms(induction furnace/electrotherm) for well reputed steel plant at rourkela 
Responsible to check all the steps from beginning to end.
Responsible to report preparation of raw material like coal rake & iron ore rake.
Responsible for equipment health & maintenance.
preparing daily testing & MIS reports
Ensure proper house ... 
								
							1 Opening(s)
									 
									10.0 Year(s) To 15.0 Year(s)								
							
									 
									6.00 LPA TO 7.00 LPA								
							
									Responsible to check all the steps from beginning to end.
Responsible to report preparation of raw material like coal rake & iron ore rake.
Responsible for equipment health & maintenance.
preparing daily testing & MIS reports
Ensure proper house keeping of lab area.
collection of sample checking the quality & reporting the seniors
responsible implementing  5s ... 
								
							1 Opening(s)
									 
									18.0 Year(s) To 20.0 Year(s)								
							
									 
									25.00 LPA TO 30.00 LPA								
							
									We Are Currently looking for Project Head for reputed Steel plant at Chhattisgarh Location.
commissioning of following Projects
Working as Project Lead steel melting shop,blast furnace,rolling mill,power plant,sponge iron,ferro alloys,
Monitoring/ tracking projects with respect to budgeted cost, demand forecasts, time over-runs to ensure timely execution of the sameManaging overall operations for executing ... 
								
							1 Opening(s)
									 
									3.0 Year(s) To 8.0 Year(s)								
							
									 
									4.80 LPA TO 6.00 LPA								
							
									WE Are Currently Looking For Fitter For BENEFICIATION Division at Nigeria (West Africa) Location.
Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Locates and ... 
								
							1 Opening(s)
									 
									3.0 Year(s) To 8.0 Year(s)								
							
									 
									4.80 LPA TO 6.00 LPA								
							
									WE Are Currently Looking For Fitter For Pellet Division at Nigeria (West Africa) Location.
Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Locates ... 
								
							1 Opening(s)
									 
									15.0 Year(s) To 25.0 Year(s)								
							
									 
									50.00 LPA TO 80.00 LPA								
							
									Urgent Requirement for AGM/DGM-BENEFICIATION for 350*4tpd plant at Nigeria (West Africa) location 
Projects sponge Iron to completion and running of plant. Both Kilns and auxiliaries project planning, control and execution.
Supervising project activities and handling the complete project cycle entailing requirement gathering and final execution.
Finalizing the requirements and specification in consultation with ... 
								
							1 Opening(s)
									 
									15.0 Year(s) To 25.0 Year(s)								
							
									 
									50.00 LPA TO 80.00 LPA								
							
									Urgent Requirement for AGM/DGM/MECHANICAL MAINTENANCE/PELLET for 350*4tpd plant at Nigeria (West Africa) location 
Projects sponge Iron to completion and running of plant. Both Kilns and auxiliaries project planning, control and execution.
Supervising project activities and handling the complete project cycle entailing requirement gathering and final execution.
Finalizing the requirements and specification in consultation ... 
								
							1 Opening(s)
									 
									10.0 Year(s) To 12.0 Year(s)								
							
									 
									4.80 LPA TO 6.00 LPA								
							
									Urgent Requirement for Assistant Manager Electrical SID for Reputed Steel plant at Bilaspur location.
In rotary kiln: - Maintenance of motor used for kiln main drive, auxiliary drive, shell air fans, coal injector, and thermocouple and transmitters.
Cooler section: - Maintenance of motor used for cooler drove.
Product separation building: - Maintenance of ... 
								
							1 Opening(s)
									 
									18.0 Year(s) To 25.0 Year(s)								
							
									 
									18.00 LPA TO 25.00 LPA								
							
									 
commissioning of following Projects
Working as Project Lead steel melting shop,blast furnace,rolling mill,power plant,sponge iron,ferro alloys,
Monitoring/ tracking projects with respect to budgeted cost, demand forecasts, time over-runs to ensure timely execution of the sameManaging overall operations for executing projects involving scoping, high level design & architecture, resource mobilization and execution within ...