1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
3.00 LPA TO 4.80 LPA
Industry - Waste Water/Water Treatment ·
Education – Chemical / Mechanical/ Environmental Engineer
Experience - Have at least 3-4 years of experience in sales & Marketing of water/waste water Treatment Plants.
Desired Candidate Profile-
Strong negotiation and interpersonal skill.
Should be able to independently handle customer interaction for technical & commercial negotiations.
Technical knowledge related to ...
1 Opening(s)
0 To 0
1.68 LPA TO 1.80 LPA
1. Good credincial 2. Passout 2024 or 20253. Local candidate only4. Salary starting CTC 15K After a six month CTC will be 17K and finally after completion of 01 year he will be Asst. Engineer and CTC will be 19K.
An Electrical & Instrumentation (E&I) Engineer is responsible for designing, developing, ...
3 Opening(s)
2.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 5.00 LPA
ETP Operations & Monitoring:
Oversee the day-to-day operations of the ETP, including physical, chemical, and biological treatment processes.
Monitor key parameters such as pH, COD (Chemical Oxygen Demand), BOD (Biochemical Oxygen Demand), TSS (Total Suspended Solids), TDS (Total Dissolved Solids), and other relevant parameters as per regulatory requirements.
Ensure the ETP operates within ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
7.20 LPA TO 8.40 LPA
Overseeing the complete lifecycle of wastewater treatment plant construction or upgrade projects, ensuring timely delivery within budget and quality standards, by managing all aspects from planning and design to installation, commissioning, and handover, while adhering to environmental regulations and safety protocols.
Candidate should have good experience as a Project Execution in Water ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 3.00 LPA
ype of pumps, blowers and other equipment
used in Sewage Treatment Plants.
Inspecting equipment to ensure that it is
working properly and efficiently.
Cleaning and repairing equipment
such as pumps, tanks, and pipes used
in wastewater treatment processes.
Maintaining records of equipment maintenance,
repair work orders, and other activities
related to the operation of treatment facilities.
Daily reporting to Plant ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 3.00 LPA
Location :- Bhosari
type of pumps, blowers and other equipment
used in Sewage Treatment Plants.
Inspecting equipment to ensure that it is
working properly and efficiently.
Cleaning and repairing equipment
such as pumps, tanks, and pipes used
in wastewater treatment processes.
Maintaining records of equipment maintenance,
repair work orders, and other activities
related to the operation of treatment facilities.
Daily reporting ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 3.00 LPA
type of pumps, blowers and other equipment
used in Sewage Treatment Plants.
Inspecting equipment to ensure that it is
working properly and efficiently.
Cleaning and repairing equipment
such as pumps, tanks, and pipes used
in wastewater treatment processes.
Maintaining records of equipment maintenance,
repair work orders, and other activities
related to the operation of treatment facilities.
Daily reporting to Plant ...
1 Opening(s)
0 To 3.0 Year(s)
1.00 LPA TO 3.00 LPA
type of pumps, blowers and other equipment
used in Sewage Treatment Plants.
Inspecting equipment to ensure that it is
working properly and efficiently.
Cleaning and repairing equipment
such as pumps, tanks, and pipes used
in wastewater treatment processes.
Maintaining records of equipment maintenance,
repair work orders, and other activities
related to the operation of treatment facilities.
Daily reporting to Plant ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 3.00 LPA
type of pumps, blowers and other equipment
used in Sewage Treatment Plants.
Inspecting equipment to ensure that it is
working properly and efficiently.
Cleaning and repairing equipment
such as pumps, tanks, and pipes used
in wastewater treatment processes.
Maintaining records of equipment maintenance,
repair work orders, and other activities
related to the operation of treatment facilities.
Daily reporting to Plant ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 5.00 LPA
aintain tooling consumption, Quality Checking of all tool and equipment, Issues and entries of tool life monitoring.
maintain minimum stock of tooling , highlight if tool life not complied to norms.
daily report for tool stock.
type of pumps, blowers and other equipment
used in Sewage Treatment Plants.
Inspecting equipment to ensure that it is
working ...