1 Opening(s)
0 To 3.0 Year(s)
1.00 LPA TO 3.00 LPA
jOB lOCATION- Chakan Pune
JOB DESCRIPTION
Key Responsibilities
1.With management supervision, develops, implements,
and releases new product BOMs for moderately complex assemblies and product structure.
Works with senior NPME to implement new product manufacturing, test, and sourcing strategies.
2.Develops and validates Operation Method Sheets (OMS) for moderately complex assemblies.
3.Partners with Sr NPMEs in 3D solid model ...
1 Opening(s)
1.0 Year(s) To 5.0 Year(s)
1.00 LPA TO 4.50 LPA
Hi All,
Greetings from Vedita Ventures!
Urgent Hiring - Admin Cum Operations
Only Male Candidates preferred
Immediate joiners preferred
A construction administrator (or site admin) Key duties include preparing invoices, processing change orders, managing labor attendance, and tracking site
Maintain accurate, up-to-date project records, including drawings, specifications, and permits.
Document Control: Maintaining accurate and updated project records, including architectural ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 3.60 LPA
Job Overview:
We are seeking an experienced Project Manager for Interior & Structure projects to oversee the planning, execution, and delivery of complex projects. The ideal candidate will have a proven track record in managing high-end interior and structural works, ensuring that projects are completed on time, within budget, and to ...
3 Opening(s)
1.0 Year(s) To 2.0 Year(s)
2.40 LPA TO 3.00 LPA
Project schedules and forecasts
• Processes project orders from order intake to end of warranty
• Manufacturing procurement/Purchase orders
• Coordination and checking of deliverables
• Project status reports and change orders
• Manage project budget. Measure, analyze, and present performance metrics of completed Project.
1) Profile: Project Co-ordinator for Junagadh / Jamnagar Location (Male)
Experience: Minimum 1-2 years ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.40 LPA
A Billing & Estimation job involves preparing detailed cost estimates, Bills of Quantities (BOQs), and tender documents, then managing project billing, invoicing clients, certifying subcontractor payments, and tracking costs to ensure profitability, requiring skills in analysis, software, and coordination with project teams to maintain accuracy and compliance.
Key Responsibilities
Estimation & Costing: Analyze project ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Job Title: Planning Engineer
Experience: Minimum 5 years’ experience as Planning Engineer in LSTK Projects.
Location: Jubail, KSA Department: Engineering / Project Management Job Type: Full-time
Basic Salary Range: 7000 – 8000 SAR
Employment Type: Full-Time, Permanent
Job Responsibilities:
Coordinate with the project manager, site manager, site engineers, job estimators, engineers of various disciplines etc. to acquire proper data ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.60 LPA TO 4.80 LPA
A Construction Project Coordinator supports Project Managers by managing logistical, administrative, and communication tasks to ensure projects finish on time and within budget. Key responsibilities include tracking schedules, maintaining documentation, liaising between stakeholders/contractors, processing permits, and monitoring site safety and budget expenditures.
Key Responsibilities
Project Planning & Tracking: Developing and maintaining project plans, schedules, ...
1 Opening(s)
0 To 1.0 Year(s)
1.44 LPA TO 2.40 LPA
creates, modifies, and documents technical drawings and 3D models using CAD software (AutoCAD, SolidWorks, NX) to support product development
Post :- Engineer (Design Dept.)
Qualification :- ITI Draftsman / Diploma Mechanical, AutoCAD
Experience :- Fresher / preferred Minimum 1 year
Salary Range :- Depend On Interview
Preference :- Male
No. of Openings :- 01
Job Description :-
Origin ...
2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.50 LPA TO 4.20 LPA
Key Responsibilities
Design & Drafting: Develop complex 3D models, assemblies, and detailed 2D drawings (sheet metal, machined parts) adhering to ASME/ANSI standards.
Engineering Analysis: Perform Finite Element Analysis (FEA), stress, and kinematic simulations to validate design functionality.
Documentation: Create Bills of Materials (BOMs), ECOs (Engineering Change Orders), and technical documentation.
Collaboration: Work with production/manufacturing teams to optimize designs ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
2.00 LPA TO 3.75 LPA
Role & responsibilities
Project planning and coordination:Develop project plans, including timelines and resource allocation, and coordinate all on-site activities to ensure they align with project goals.
Personnel management:Hire and manage construction workers, including general contractors and subcontractors, delegating tasks and ensuring their work meets quality standards.
Safety and quality control:Conduct regular safety inspections, ...