1 Opening(s)
4.0 Year(s) To 7.0 Year(s)
Not Disclosed by Recruiter
We have an urgent requirement for Job Opportunity for Junior Civil Site Engineer, Japanese Based MNC, Job Description as follows:Experience: 5.0 Year(s) To 7.0 Year(s)Job Location: Haryana- Revari
Job Role –
Exposure in Industrial projects / Factory Project
Planning and Scheduling
Site Execution
Supervise all execution activities
Should be qualified with B.E/BTech Civil/Diploma.
Bachelor accommodation and food in Site.
Kindly submit your following Documents for further process ...
1 Opening(s)
4.0 Year(s) To 7.0 Year(s)
4.00 LPA TO 4.80 LPA
Civil Site Engineer
Location : South KolkataCivil Diploma or Degree which ever highest Min 4 yrs exp on wards as Site EngineerWorked on Have to know the knowledge and exp in Mivan Technologies Have to know the knowledge and exp Aluminium form Structural start to finish work Auocad knowledge
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.20 LPA
- Diploma, BE in Civil engineering with min 3 to 5 yrs experience in handling construction site at Pimple saudagar location.
- Monitors ongoing construction to ensure that the work is being done correctly and the project stays on schedule.
- checking plans, execution done as per drawings and quality of work
- ...
4 Opening(s)
3.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Description:
The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before Concreting9. ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Job Location- Chinchwad Pune
JOB DESCRIPTION
Job descriptionin September 1986 initially started as a machining unit with
backward integration of forging and casting for Auto Components and
started its commercial production in 1989 and ever since then has taken
precision forging to another level with its excellence in commitment and unbeatable quality.
Since then Company has ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 5.00 LPA
Qualification: BE. CivilExperience: 5 TO 8 Years in Construction / Real Estate Industry.Gender: MaleAge Limit: 28 to 35 yrsWork location: Nigdi in Pune
Technical Skills / Key skills: AUTOCAD, KNOWLEDGE OF DC RULES.Job Descriptions:1. Coordination with Site engineers, Contractors & Consultants for smooth project working.2. Monitoring site execution, project work completion.3. ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
2.40 LPA TO 3.00 LPA
Role & Responsibilities:
Creating or understanding the detailed AutoCAD drawings based on site layout measurements.
Design and implementation of ETP, STP, and FSTP.
Searching, Filing, and documentation for relevant bids and tenders.
Estimating costs as per Public Works Department (PWD) and Maharashtra Jeevan Pradhikaran (MJP) rates and Preparing Detailed Project ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
10.80 LPA TO 12.60 LPA
BE civil engineer
· Working experience in industrial and residential projects
· Family background from same field
· age below 40 yrs
· working as site engineer can also work
· English speaking
· site meeting handling
· 3-5 yrs working experience in India
· remaining experience in Africa
· preferably in east Africa as added advantage
Analyze photographs, drawings and maps to inform the direction of projects as ...
3 Opening(s)
8.0 Year(s) To 20.0 Year(s)
Not Disclosed by Recruiter
Organization StructureSr Engineer Reports To Project Manager
Qualification: B.E. CivilExperience: 8+ Years in handling Mivan ProjectsWork location: on Pirangut road in PuneSalary: Negotiable for right candidate
Purpose:Responsible to complete and handover the allotted building in given schedule with standard SOP.To ensure overall Execution of work and provide technical support to subordinates.To complete assigned ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.00 LPA TO 3.00 LPA
Design: Develop designs for projects, including roads, bridges, tunnels, and water systems
Inspection: Conduct site inspections and feasibility assessments
Construction: Oversee the construction of projects, including checking the strength of the foundation and skeleton before concrete is poured
Budgeting: Calculate estimated costs for projects and ensure they stay within budget
Procurement: Procure the necessary resources for the project
Management: Manage workers ...