1 Opening(s)
6.0 Year(s) To 13.0 Year(s)
5.00 LPA TO 9.00 LPA
Sr. No. Details1responsible for smooth running of Effluent treatment plant (ETP), ReverseOsmosis (RO), Multiple effect Evaporators (MEE), Agitated Thin Film Dryers(ATFD) and hazardous waste disposal.2 Ensure Operational cost reduction by optimizing power, manpower, utilitiesand chemical consumption.3 Treatment techniques in vision of quality/quantity (High TDS/ COD, Processeffluents etc.)4 Conduct environmental programs ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 9.00 LPA
Sr. No. Details1responsible for smooth running of Effluent treatment plant (ETP), ReverseOsmosis (RO), Multiple effect Evaporators (MEE), Agitated Thin Film Dryers(ATFD) and hazardous waste disposal.2 Ensure Operational cost reduction by optimizing power, manpower, utilitiesand chemical consumption.3 Treatment techniques in vision of quality/quantity (High TDS/ COD, Processeffluents etc.)4 Conduct environmental programs ...
1 Opening(s)
0 To 0
0.00 LPA TO 0.00 LPA
PRINCIPAL ACCOUNTABILITIES
Suggest measures to contain & mitigate the risks in the business.• Should be capable of doing internal audit independently of each function.• Should be responsible for making checklist, process flow chart for each function during Internal audit. • Should work in planned and organised manner and adhere to deadlines ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
12.00 LPA TO 13.00 LPA
As a General Manager for Production in a Direct Reduced Iron (DRI) plant, you'll oversee all aspects of the DRI production process, ensuring efficient operations, quality control, and adherence to safety and regulatory standards, while also managing personnel and budgets.
Here's a more detailed breakdown of the responsibilities and qualifications:
Key Responsibilities:
Production Management:
Oversee ...
2 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
Operation of CHP Equipment:
Operate and control combined cycle gas turbine (CCGT), steam turbines, boilers, heat recovery steam generators (HRSG), and associated auxiliary equipment to generate electricity and thermal energy in accordance with production demands and grid requirements.
Monitor and adjust operating parameters such as fuel flow, steam pressure, turbine speed, and ...
1 Opening(s)
13.0 Year(s) To 20.0 Year(s)
20.00 LPA TO 22.00 LPA
WORKING CONDITION: Factory/plant environment with several hours to work as per need.
Job Description: Manager (Process) -PLA polymerization &Palletization Section
Reports To: Production Head
Job Objective-:To establish, maintain and sustain all included process conditions as shift manager to ensure -the consistent production of Poly Lactic acid and pallets from purified lactides,while maximizing efficiency and ...
1 Opening(s)
13.0 Year(s) To 20.0 Year(s)
18.00 LPA TO 22.00 LPA
WORKING CONDITION: Factory/plant environment with several hours to work as per need.
Job Description: Manager (Production) -Lactide synthesis Section
Reports To: Production Head
Job Objective-:To establish, maintain and sustain all included process conditions as Manager to ensure -the consistent synthesis and production of lactides (of desired quality) from purified lactic acid, while maximizing efficiency ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 8.00 LPA
A Process Shift Incharge in a coal washery is responsible for overseeing the entire coal washing process during their assigned shift, ensuring smooth operation, quality control, and adherence to safety and environmental regulations. They supervise personnel, monitor equipment performance, and troubleshoot any operational issues.
Here's a more detailed breakdown:
Key Responsibilities:
Shift Operations Management: Overseeing the ...
1 Opening(s)
11.0 Year(s) To 14.0 Year(s)
Not Disclosed by Recruiter
Profile summary:The Manager (Information Systems and Security) is responsible for overall ‘InformationTechnology Services (ITS) function and in defining, implementing and documenting relevantprocesses, procedures and standards. This role will be in charge of establishing and maintainingan organisation wide information systems, infrastructure, and security, management program toensure that information assets are well ...
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.60 LPA TO 4.80 LPA
A Production Planning Manager in heavy machinery focuses on overseeing and optimizing the entire production process, from scheduling to resource allocation, to ensure timely, cost-effective, and high-quality output. This role involves close coordination with various departments and requires strong leadership, analytical, and problem-solving skills.
Here's a more detailed breakdown:
Key Responsibilities:
Production Planning & Scheduling:
Develop ...