1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Post: Maintenance Shift In charge
Education: DEE / BE Electrical
Experience: Min 6 Years in Rolling Mill / Steel Industry
Job Profile: Working in a general shift, make daily job planning, manpower planning as per rolling section.
Responsible for doing pm-1(preventive maintenance) jobs .shift schedule and daily checklist follow-up,
Responsible for Electrical & Automation Maintenance of 600-meter long HAPL Line consist of Entry section, RCM Welder,6-HI Cold / Hot Rolling Mill, Furnace, Scale Breaker, Shot- Blaster, Pickling, Entry-Mill & Exit Loppers & exit Section.
Responsible for handling all maintenance related activities of ABB PLC's,AC Drives,AC Motors and DCS 800xA System and LT and HT switch Gears used in the plant
Knowledge in logic solving in control panels & various interlocking schemes required for automation and analyzing all drawings related to automation & control systems.
Instrumental in coordinating with various internal departments and contractor personnel for safe execution of shutdowns and ensuring implementation of routine/preventive/breakdown maintenance schedules of the system to increase machine uptime, equipment reliability thereby.
Responsible for maintaining 5S activity & safety measures regularly
To co-ordinate with the Electrical contractor for Execution, Erection, and Commissioning
Basic Knowledge of Sheet CENTER GUIDE and STEERING UNIT, EDGE System provided by EMG.
Knowledge of hardware Communication between Drives, PLC and HMI’s through Fiber Optic and Profibus.
Knowledge of Gauge Measurement system provided by IMS used at 6 HI in Line Mill.
Responsible for keeping a record of the daily power consumption, daily delay report, spare parts list of the plant.
Basic Knowledge about Control-Logix / Compact-Logix systems of Allen-Bradley PLC (Rockwell Automation).
Identifying NetLinx networks for use in a Logix5000 System used for in-line Welder.
Successfully accomplished Erection, testing, Commissioning of ARP System(Acid Recovery Process
To maintain records, logbook for the job carried out.
Organize safety meetings & give on the Job training to my subordinates
To ensure good housekeeping in the area and the shop floor.
Take participate in IMS internal audit and prepare all supporting document
To maintain a record of bypass of trip & interlock as per the procedures.
Working on SAP (Plant Maintenance Module).
Job Location: Chitegaon MIDC, Aurangabad Maharashtra
For more details call on 7249840333 / 9765567506
Send CV on career@paradiseplacement.co.in
1 Opening(s)
6.0 Year(s) To 11.0 Year(s)
6.00 LPA TO 7.00 LPA
Company Profile: Established largest distillery in Maharashtra, started molasses base production in the month of December-2008, having manufacturing capacity of 1.20kl/per day with modern technology and advanced plant and machinery with latest technology and atomization PLC, SCDA. DCS etc systems and having our own 3 MW thermal /co-generation captive power plant, ...
2 Opening(s)
1.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 3.00 LPA
Diploma or BE in Electrical engineer for designing Control Panel.Experience: 2 to 6 years experience. Job profile:Experience in control panel designing by using Autocad software.
Designing of electrical distribution and control panels based on PLC / DCS / VFD.Jobs will be supporting/making Proposal Engineering i.e BOQ preparation and costing of the Panels.Salary: ...
2 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.40 LPA
A Turbine DCS Engineer job description involves operating and maintaining a plant's Distributed Control System (DCS) to monitor and control turbine operations for efficiency and safety. Key responsibilities include configuring DCS systems, troubleshooting equipment malfunctions, performing routine maintenance, ensuring compliance with safety regulations, and providing technical support to operators. This role ...
3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Candidate must have sound knowledge of CFBC Boiler DCS operation with 3 – 4 years of experience for B. Tech Holders or 5 – 8 years for Diploma Holders.
Preference will be given to the candidate having experience of Thermax make IRCFBC Boiler.
Urgent requirement of Boiler DCS Engineer/Operator for 2*35 MW ...
2 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 2.40 LPA
Candidate must have sound knowledge of CFBC Boiler DCS operation with 3 – 4 years of experience for B. Tech Holders or 5 – 8 years for Diploma Holders.
Preference will be given to the candidate having experience of Thermax make IRCFBC Boiler.
Urgent requirement of Boiler DCS Engineer/Operator for 2*35 MW ...
4 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
A Boiler DCS Engineer monitors and controls boiler operations through a Distributed Control System (DCS) to ensure safe and efficient steam generation. Key responsibilities include operating the DCS, executing start-up and shutdown procedures, monitoring critical parameters like pressure and temperature, and responding to alarms and abnormal conditions. This role also involves troubleshooting issues, ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.50 LPA TO 2.40 LPA
Urgent requirement of DCS Engineer/Operator for 33 MW Power Plant,B.E/Diploma (Mech./Electrical) with 3 to 5 years experience as a DCS Operator/Engineer in Power Plant in operation.Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control circuit, monitoring,DCS, PLC ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.16 LPA TO 3.00 LPA
A DCS Engineer for Boiler/Turbine is responsible for operating and optimizing power plant equipment using a Distributed Control System (DCS). Key duties include monitoring and controlling boiler and turbine operations through the DCS, ensuring safe and efficient performance by adjusting parameters like pressure and temperature, and executing start-up and shutdown procedures. The role ...
6 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 3.60 LPA
A "TURBINE DCS ENGINEER" role, especially in a context like "Belpan" (which may refer to a specific power plant or location), involves operating and managing a Distributed Control System (DCS) for turbine operations. This role requires a combination of technical expertise and experience in DCS systems like Siemens, Yokogawa, ABB, or ...