2 Opening(s)
7.0 Year(s) To 15.0 Year(s)
8.00 LPA TO 9.00 LPA
Job Title: Project Manager - Solar EPC (Ground-Mounted Projects)
Location: Khavda, Gujarat,Experience
Required: Minimum 7+ years in Solar Ground-Mounted Projects Project Experience:
Must have handled 200MW+ cumulative capacity Total
Job Summary: We are seeking a seasoned Project Manager with extensive experience in Solar EPC ground-mounted projects. The ideal candidate will be responsible for end-to-end ...
1 Opening(s)
7.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 8.40 LPA
Job Title: Project Manager - Procurement, Execution & Management Location: Goa or Rajkot with Pan-India Site Travel Department: Projects & Execution Reporting to: Head – Projects Level: Mid-Level
Client is a premium solar solutions provider, specializing in high-quality C&I rooftop and ground-mounted solar installations. With a focus on superior engineering, seamless execution, ...
1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
5.00 LPA TO 6.00 LPA
Assistant Manager Department: Design (Solar)
Location: Ahmedabad HO
Experience Required: 3+ Years Joining:
We are looking for a skilled and detail-oriented Assistant Manager - Design to join our renewable energy team. The ideal candidate will have hands-on experience in designing ground-mounted solar PV systems and a strong understanding of engineering principles, industry standards, ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
It is a fixed tilt plant with 104 MW. Location is Jadi, GJ and Dhanera is the nearby city (15 kms away)able to handle local issues properly He should have experience of handling atleast 70 MW independently Should have Solar Ground Mounted Exposure of min 10 Years through out. Should ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
It is a fixed tilt plant with 104 MW. Location is Jadi, GJ and Dhanera is the nearby city (15 kms away)able to handle local issues properly He should have experience of handling atleast 70 MW independently Should have Solar Ground Mounted Exposure of min 10 Years through out. Should ...
2 Opening(s)
13.0 Year(s) To 16.0 Year(s)
20.00 LPA TO 20.00 LPA
Business Solar business
1) Job Purpose: Write the purpose for which the job exists
The Solar Power Plant Manager is responsible for maximizing revenue generation and minimizing operational losses and costs by overseeing efficient Operation & Maintenance and Asset Management ofthe Solar power plant. This role ensures regulatory compliance and smooth coordination with ...
1 Opening(s)
1.0 Year(s) To 6.0 Year(s)
2.00 LPA TO 5.00 LPA
The missions and responsibilities of the CAD Executive_Engineering are :
- Preparation of Preliminary and detailed solar PV layouts for ground Mounted Solar PV & other
various supported Electrical equipment’s.
- Preparation of Array layout, stringing layout, cable routing and trench layout, road layout.
- Preparation of Electrical Layout for ICR, MCR, substation, street ...
1 Opening(s)
2.0 Year(s) To 8.0 Year(s)
10.00 LPA TO 10.80 LPA
Job Title: Design Engineer – Solar Power Projects Location: As required Reporting To: Technical Head / Project Lead 1. Role Objective To ensure all solar power plant designs are technically accurate, execution-ready, and compliant with applicable standards. The Design Engineer acts as a design validator and quantity checker, responsible for ...
3 Opening(s)
4.0 Year(s) To 8.0 Year(s)
3.60 LPA TO 4.20 LPA
Job Title: Solar Project Manager
Department: Projects / Operations
Reports To: Head – Projects / Director
Job Summary:
The Solar Project Manager will be responsible for end-to-end execution of solar power projects (Rooftop / Ground-mounted / Utility-scale). The role involves planning, designing, coordinating, and supervising installation, commissioning, and maintenance, ensuring projects are delivered on ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.50 LPA
Roles & Responsibilities :
Set up the SOP for site survey and design. Supervise the work of the design engineer for accuracy, and optimization of design as per site survey conducted.
Ensure BoM is designed to maximize cost-benefit to achieve while keeping losses at a minimum.
Conduct site surveys before plant design and ...