1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
4.00 LPA TO 5.00 LPA
Supervise and coordinate all activities on the needle and roller bearing production lines (including assembly, grinding, and inspection processes).
Ensure production targets (quantity, quality, and deadlines) are met during each shift while maintaining strict adherence to safety protocols.
Monitor key operational metrics such as OEE (Overall Equipment Effectiveness), downtime, rejection rates, and ...
1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
40.00 LPA TO 42.00 LPA
Purpose of the RoleTo provide operational leadership for end-to-end manufacturing operations, covering Pre-Kiln and Post-Kiln processes & Engineering ensuring safe, efficient, cost-effective, andhigh-quality production aligned with business objectives.Key Responsibilities1. Overall Manufacturing Leadership Head complete manufacturing operations, including Slip House, Shaping, Drying,kiln firing, Glazing, assembly, testing, Cutting & grinding etc. Develop ...
2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.00 LPA
RESPONSIBILITIES- Foster culture of Safety and quality amogst the productionTeam memebers- Execute day to day operational activities by following standard operating procedures and work related instructions in safe and compliant manner- Take ownership for productivity, safety and quality related compliance execution in respective work areas as per defined company standards. ...
1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
4.50 LPA TO 5.50 LPA
The Senior PPC Engineer is responsible for end-to-end production planning, scheduling, and control to ensure maximum productivity, optimal resource utilization, and on-time delivery of PCBs. This role involves transforming customer orders into detailed production plans, managing raw material inventory, and coordinating across departments (sales, production, engineering) to meet targets while ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
4.20 LPA TO 4.80 LPA
A Mechanical Foreman in a steel manufacturing company oversees the maintenance, repair, and installation of heavy industrial machinery (such as blast furnaces, rolling mills, conveyors, and crushers). This role ensures that production equipment operates reliably, with a high emphasis on minimizing downtime and adhering to strict safety protocols.
Job Responsibilities:
Maintenance & Repair: Execute preventive, ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
4.50 LPA TO 5.00 LPA
Position: Jr. Engineer - Production
Location: Ankleshwar
Experience: 2 - 5 Years
Industries: Plastic
Responsibilities:
Plan and execute daily production as per schedule.
Monitor blow moulding machines and process parameters.
Ensure optimum machine utilization and productivity.
Troubleshoot production issues.
Coordinate with Quality, Maintenance, and Tool Room teams.
Reduce rejection, material wastage, and downtime.
Maintain production reports, ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
12.00 LPA TO 13.00 LPA
JOB DESCRIPTION
10.02.26
126029
HPS/2026/118
General Manager Operatios
Male
1
12 to 15
B.E-Mech
8 Hours
Industry: Wire Manufacturing | Steel | Heavy Engineering
Location: Sarigam, Gujarat (GIDC)
Reporting to: Deputy CEO and Managing Director
Travel: As required to Head Office, Mumbai
Years of Experience: 12+ years
Minimum Commitment: 2 years
Preferred Age: 35+ years
Role Overview The General Manager – ...
1 Opening(s)
7.0 Year(s) To 9.0 Year(s)
7.00 LPA TO 9.00 LPA
JD of Production Manager
Supervising daily production operations and shop floor activitiesEnsuring production targets, quality standards, and timelines are met.Coordinate corrective and preventive maintenance activities for Fin Press and Hairpin Bendingmachines in collaboration with the maintenance team; support root cause analysis andimplementation of permanent countermeasures.Manage Heat Exchanger / Coil Shop line ...
1 Opening(s)
15.0 Year(s) To 18.0 Year(s)
35.00 LPA TO 45.00 LPA
Position: Plant Head
Location: Vapi
Experience: 15 - 18 Years
Industries: Pharma
Responsibilities:
Define and execute the overall operations strategy covering Production, Warehouse, Engineering & Maintenance, Utilities, HSE, and Administration.
Drive operational readiness for regulated markets through robust GMP practices, documentation discipline, and cross-functional alignment with QA/QC.
Lead capacity planning, productivity ...
1 Opening(s)
9.0 Year(s) To 15.0 Year(s)
12.00 LPA TO 15.00 LPA
Monitor and control day-to-day operations of the Tape Plant and Looms, ensuring consistent quality and production output.
? Apply all required technical formulas and parameters for running Tape Plant and Loom machines effectively.
? Plan daily and weekly production based on BOM, order priorities, and machine capacities.
Coordinate with Cutting, Printing, Stitching, QA, ...