2 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.20 LPA TO 1.80 LPA
Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Locates and marks bending and cutting lines onto work piece, allowing for stock thickness
welder,iti ...
2 Opening(s)
2.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.40 LPA
Chemical analysis of product like Spong Iron ,Pig Iron, Bf Slag, Coke, Sinter, Metal and Chemical analysis of Raw
Material Like Iron Ore , Coal, Pellet Ore, Coking Coal, Dolomite, Lime Stone , Mangneese Ore, Bed
Material,Ironpellet, Quatrzite, Flourspore & Pyroxinite. Bentonite,Carbondust,Diesel,,Furnace oil etc
Instrumental Analysis:
Operation of Instrument Like Proximate Analyzer (Leco TGA ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
5.00 LPA TO 6.50 LPA
We are looking for a true techno-commercial individual who is excited to take up new challenges. The incumbent will be expected to be the rainmaker for Our client, getting relevant B2B customers on board, nurturing them and converting them to consistent key accounts. The desired candidate must have flair for ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
3.60 LPA TO 6.00 LPA
We are looking for a Geologist to analyze geological data and plan our geology-related project Minor minerals.
Plan geology projects (Baxuite/granite/limestone minerals) and field sampling events
Survey sites and create logs
Gather and analyze geological data
Coordinate research programs
Examine the composition of samples and specimens
Measure and test fossils, rocks, soil, ores and other material ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.00 LPA
We Are Currently Looking for Rigger Steel plant For Steel Plant at w Africa Nigeria Location
A responsible person for all the rigging assignments of lifting heavy objects to higher elevation on critical locations in the plant with or without the assistance of heavy equipment. Helping the maintenance team lifts & ...
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
1.44 LPA TO 1.80 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
3.00 LPA TO 3.60 LPA
Working in hydraulic department. Maintenance lubrication system gear box lubrication.
maintenance of mill, shift handling as shift incharg manpower handling, mechanical Responsible for breakdown & preventive maintenance etc.
mechanical maintenance of mill, &equipments like ejector ,blowers, furnace, pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box, laying head ,conveyor, ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.50 LPA TO 2.75 LPA
Online packing process & material inspection (Cleaning, Moisture, Physical and chemical testing).? Online cleaning inspection (Material sorting instruction).? Physical Quality (Extraneous matters, insect damages, colour & etc.)? Chemical quality (Moisture, Volatile & Non-Volatile oil, Ash, Acid insoluble ash, Acidity, Starch, Crude Fiber, Heat values (Capsaicin for chilli), Curcumin (Turmeric),Pipperine (Black ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...