2 Opening(s)
2.0 Year(s) To 15.0 Year(s)
1.40 LPA TO 5.00 LPA
Required Service engineer/Site Incharge with 2 to 15 year Experience With Electrical and Electronic Engineer for Maintenance of Electrics Equipment HT & LT Switch Yad
We are leading Mfg Unit Group of Industries for our new project in silvassa we need Service provider/Site Engineer for Programmable Logic Controller Repairing Service, Variable ...
1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 10.00 LPA
6-8 year years’ experience in design of mould for engineering application like automobile or switch gear. Should be able to operate NX CAD software
candidates must be PMD CIPET with 6-8 Year Experience in Tool Design on NXHaving Valid PassportGood computer skill and communication skillsReady to Move any time.
1 Opening(s)
0 To 2.0 Year(s)
1.80 LPA TO 2.40 LPA
Job description
20/11/2023
HPS-535/09 02 HPS/2023/746
ITI Electrician
Male
2
0 to 2
ITI Electrician
Roles and Responsibilities
handling operation & troubleshooting of all plant equipments in their dept. like HT LT panel, motor, MCV ,VCV, transformers, Switch gear, wiring, panel, circuits, PLC etc.predictive & preventive maintenance
Desired Candidate Profile
candidate should have good knowledge of maintenance of all equipments.preference industry: ...
2 Opening(s)
2.0 Year(s) To 15.0 Year(s)
1.40 LPA TO 5.00 LPA
Required Service engineer/Site Incharge with 2 to 15 year Experience With Electrical and Electronic Engineer for Maintenance of Electrics Equipment HT & LT Switch Yad
We are leading Mfg Unit Group of Industries for our new project in silvassa we need Service provider/Site Engineer for Programmable Logic Controller Repairing Service, Variable ...
2 Opening(s)
2.0 Year(s) To 4.0 Year(s)
2.00 LPA TO 2.80 LPA
Hiring for Electrical Switch Gear Industry in Ahmednagar.
Position: Production Engineer
JOB Type: On roll
Vacancy: 2
Salary: 3 LPA
Responsibilities:-
New fixture develop as per requirements
Rejection control and Problem-solving
Provided monthly and daily production plan as per the dispatch schedule
Preparation of production-related documents as per client’s requirement such as production report,
Executing production operations and leading the team
Worked on ...
1 Opening(s)
1.6 Year(s) To 3.0 Year(s)
Not Disclosed by Recruiter
Qualification: BE in Electrical, Electronics / MechanicalExp: 1.6 to 2 yrGender: Female
Job profile:
Experience in Autocad, work in electrical drawing , control panel and switch gear.
Work on Customers enquiry, understand client requirements, prepare quotations / Proposal for electrical instruments, Product costing etc. Coordinate with clients, Sales team to get client order.Purchase order processing, ...
1 Opening(s)
0 To 1.0 Year(s)
1.00 LPA TO 1.20 LPA
Job Description:
Material inward
Material inward & check the physical quantity
Finishing job work update in system
Plant II material weight verify
Plant II material issue as per issue slip
Switch, compression & deflashing material issue as per issue slip
Issue in system
Give WIP Acknowledge & check material physically
Avoid stock mismatches in store
GRN Preparation
Responsible for proper material ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Post: Maintenance Shift In charge
Education: DEE / BE Electrical
Experience: Min 6 Years in Rolling Mill / Steel Industry
Job Profile: Working in a general shift, make daily job planning, manpower planning as per rolling section.
Responsible for doing pm-1(preventive maintenance) jobs .shift schedule and daily checklist follow-up,
Responsible for Electrical & Automation Maintenance of 600-meter long HAPL Line consist of Entry section, RCM Welder,6-HI Cold / Hot Rolling Mill, Furnace, Scale Breaker, Shot- Blaster, Pickling, Entry-Mill & Exit Loppers & exit Section.
Responsible for handling all maintenance related activities of ABB PLC's,AC Drives,AC Motors and DCS 800xA System and LT and HT switch Gears used in the plant
Knowledge in logic solving in control panels & various interlocking schemes required for automation and analyzing all drawings related to automation & control systems.
Instrumental in coordinating with various internal departments and contractor personnel for safe execution of shutdowns and ensuring implementation of routine/preventive/breakdown maintenance schedules of the system to increase machine uptime, equipment reliability thereby.
Responsible for maintaining 5S activity & safety measures regularly
To co-ordinate with the Electrical contractor for Execution, Erection, and Commissioning
Basic Knowledge of Sheet CENTER GUIDE and STEERING UNIT, EDGE System provided by EMG.
Knowledge of hardware Communication between Drives, PLC and HMI’s through Fiber Optic and Profibus.
Knowledge of Gauge Measurement system provided by IMS used at 6 HI in Line Mill.
Responsible for keeping a record of the daily power consumption, daily delay report, spare parts list of the plant.
Basic Knowledge about Control-Logix / Compact-Logix systems of Allen-Bradley PLC (Rockwell Automation).
Identifying NetLinx networks for use in a Logix5000 System used for in-line Welder.
Successfully accomplished Erection, testing, Commissioning of ARP System(Acid Recovery Process
To maintain records, logbook for the job carried out.
Organize safety meetings & give on the Job training to my subordinates
To ensure good housekeeping in the area and the shop floor.
Take participate in IMS internal audit and prepare all supporting document
To maintain a record of bypass of trip & interlock as per the procedures.
Working on SAP (Plant Maintenance Module).
Job Location: Chitegaon MIDC, Aurangabad Maharashtra
For more details call on 7249840333 / 9765567506
Send CV on career@paradiseplacement.co.in
1 Opening(s)
0 To 1.0 Year(s)
1.20 LPA TO 1.44 LPA
Material inward
Material inward & check the physical quantity
Finishing job work update in system
Plant II material weight verify
Plant II material issue as per issue slip
Switch, compression & deflashing material issue as per issue slip
Issue in system
Give WIP Acknowledge & check material physically
Avoid stock mismatches in store
GRN Preparation
Responsible for proper material handling
Monthly ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.20 LPA TO 1.44 LPA
Material inward
Material inward & check the physical quantity
Finishing job work update in system
Plant II material weight verify
Plant II material issue as per issue slip
Switch, compression & deflashing material issue as per issue slip
Issue in system
Give WIP Acknowledge & check material physically
Avoid stock mismatches in store
GRN Preparation
Responsible for proper material handling
Monthly ...