152 Job openings found

2 Opening(s)
2.0 Year(s) To 15.0 Year(s)
1.40 LPA TO 5.00 LPA
  Required Service engineer/Site Incharge with 2 to 15 year Experience With Electrical and Electronic Engineer for Maintenance of Electrics Equipment HT & LT Switch Yad We are leading Mfg Unit Group of Industries for our new project in silvassa we need Service provider/Site Engineer for  Programmable Logic Controller Repairing Service, Variable ...
1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 10.00 LPA
6-8 year years’ experience in design of mould for engineering application like automobile or switch gear. Should be able to operate NX CAD software candidates must be PMD CIPET with 6-8 Year Experience in Tool Design on NXHaving Valid PassportGood computer skill and communication skillsReady to Move any time.      
1 Opening(s)
0 To 2.0 Year(s)
1.80 LPA TO 2.40 LPA
Job description 20/11/2023   HPS-535/09 02 HPS/2023/746 ITI Electrician Male 2 0 to 2 ITI Electrician Roles and Responsibilities  handling operation & troubleshooting of all plant equipments in their dept. like HT LT panel, motor, MCV ,VCV, transformers, Switch gear, wiring, panel, circuits, PLC etc.predictive & preventive maintenance Desired Candidate Profile  candidate should have good knowledge of maintenance of all equipments.preference industry: ...
2 Opening(s)
2.0 Year(s) To 15.0 Year(s)
1.40 LPA TO 5.00 LPA
  Required Service engineer/Site Incharge with 2 to 15 year Experience With Electrical and Electronic Engineer for Maintenance of Electrics Equipment HT & LT Switch Yad We are leading Mfg Unit Group of Industries for our new project in silvassa we need Service provider/Site Engineer for  Programmable Logic Controller Repairing Service, Variable ...
2 Opening(s)
2.0 Year(s) To 4.0 Year(s)
2.00 LPA TO 2.80 LPA
Hiring for  Electrical Switch Gear Industry in Ahmednagar. Position: Production Engineer   JOB Type: On roll    Vacancy: 2 Salary: 3 LPA   Responsibilities:-   New fixture develop as per requirements Rejection control and Problem-solving Provided monthly and daily production plan as per the dispatch schedule Preparation of production-related documents as per client’s requirement such as production report, Executing production operations and leading the team Worked on ...
1 Opening(s)
1.6 Year(s) To 3.0 Year(s)
Not Disclosed by Recruiter
Qualification: BE in Electrical, Electronics / MechanicalExp: 1.6 to 2 yrGender: Female Job profile: Experience in Autocad, work in electrical drawing , control panel and switch gear. Work on Customers enquiry, understand client requirements, prepare quotations / Proposal for electrical instruments, Product costing etc. Coordinate with clients, Sales team to get client order.Purchase order processing, ...
1 Opening(s)
0 To 1.0 Year(s)
1.00 LPA TO 1.20 LPA
Job Description:   Material inward Material inward & check the physical quantity Finishing job work update in system Plant II material weight verify Plant II material issue as per issue slip Switch, compression & deflashing material issue as per issue slip Issue in system Give WIP Acknowledge & check material physically Avoid stock mismatches in store GRN Preparation Responsible for proper material ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Post: Maintenance Shift In charge    Education: DEE / BE Electrical    Experience: Min 6 Years in Rolling Mill / Steel Industry   Job Profile: Working in a general shift, make daily job planning, manpower planning as per rolling section. Responsible for doing pm-1(preventive maintenance) jobs .shift schedule and daily checklist follow-up, Responsible for Electrical & Automation Maintenance of 600-meter long HAPL Line consist of Entry section, RCM Welder,6-HI Cold / Hot Rolling Mill, Furnace, Scale Breaker, Shot- Blaster, Pickling, Entry-Mill & Exit Loppers & exit Section. Responsible for handling all maintenance related activities of ABB PLC's,AC Drives,AC Motors and DCS 800xA System and LT and HT switch Gears used in the plant  Knowledge in logic solving in control panels & various interlocking schemes required for automation and analyzing all drawings related to automation & control systems. Instrumental in coordinating with various internal departments and contractor personnel for safe execution of shutdowns and ensuring implementation of routine/preventive/breakdown maintenance schedules of the system to increase machine uptime, equipment reliability thereby. Responsible for maintaining 5S activity & safety measures regularly To co-ordinate with the Electrical contractor for Execution, Erection, and Commissioning Basic Knowledge of Sheet CENTER GUIDE and STEERING UNIT, EDGE System provided by EMG. Knowledge of hardware Communication between Drives, PLC and HMI’s through Fiber Optic and Profibus. Knowledge of Gauge Measurement system provided by IMS used at 6 HI in Line Mill. Responsible for keeping a record of the daily power consumption, daily delay report, spare parts list of the plant. Basic Knowledge about  Control-Logix / Compact-Logix systems of Allen-Bradley PLC (Rockwell Automation). Identifying NetLinx networks for use in a Logix5000 System used for in-line Welder. Successfully  accomplished Erection, testing, Commissioning of ARP System(Acid Recovery Process To maintain records, logbook for the job carried out. Organize safety meetings & give on the Job training to my subordinates To ensure good housekeeping in the area and the shop floor. Take participate in IMS  internal audit  and prepare all supporting document To maintain a record of bypass of trip & interlock as per the procedures. Working on SAP (Plant Maintenance Module).   Job Location: Chitegaon MIDC, Aurangabad Maharashtra   For more details call on 7249840333 / 9765567506   Send CV on career@paradiseplacement.co.in
1 Opening(s)
0 To 1.0 Year(s)
1.20 LPA TO 1.44 LPA
Material inward Material inward & check the physical quantity Finishing job work update in system Plant II material weight verify Plant II material issue as per issue slip Switch, compression & deflashing material issue as per issue slip Issue in system Give WIP Acknowledge & check material physically Avoid stock mismatches in store GRN Preparation Responsible for proper material handling Monthly ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.20 LPA TO 1.44 LPA
Material inward Material inward & check the physical quantity Finishing job work update in system Plant II material weight verify Plant II material issue as per issue slip Switch, compression & deflashing material issue as per issue slip Issue in system Give WIP Acknowledge & check material physically Avoid stock mismatches in store GRN Preparation Responsible for proper material handling Monthly ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile