1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
8.00 LPA TO 12.00 LPA
Desired Profile:• Industry: Experience in Manufacturing of Alluminium Wires and Wire products preferred• Experience in Manufacturing - GI/MS/steel Wire or Cable products can also be consideredMain Purpose:The Plant Manager’s primary responsibilities include leading the operation and maintenance staff, the daily management and coordination of plant operations including production, logistics and ...
2 Opening(s)
10.0 Year(s) To 15.0 Year(s)
9.00 LPA TO 14.00 LPA
Client Details:
Systematic Group
Established in the year 2000, we have grown to become one of the most respected names in Indian steel wire industry. With a history of more than 20 years in steel and with in-depth knowledge of wire industry, Systematic has been growing at an accelerating rate and widening ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 3.00 LPA
Hiring for PPC Engineer in Aurangabad
Education: BE Electronic / BE Electrical
Gender: Female
Experience: Min 1 Years in Production / Production Planning
JOB PROFILE:
MANUFACTURING PLANNING
•Prepare & monitor - monthly & daily assembly production as well as dispatch plan as per customer schedule/coverage
•Prepare & monitor - monthly & daily Cable cutting & wire harness production/supply plan as per assembly requirement
•Co-ordinate production through various departments/sections & ensure that production targets are achieved with regards to both quantity and quality
•Coordinate with procurement colleagues for availability of child parts material required for daily production plan & Investigate/solve problems resulting from material shortages, however caused.
•Review & follow up critical child part material shortages require for daily production lines with logistics/store /quality department.
•Perform manufacturing planning function in CFT of new projects & ensure system support for mapping the process in the system for in-house & outsource products
•Prepare monthly production variance report and highlight to all concern
CUSTOMER LOGISTIC PLANNING
•Ensure 100% customer (OEM / OES / Aftermarket) schedule compliance for the month.
•Responsible for achieving 100% OEM / OES customer service level for the month
•Taking follow-up with packing department for OTD supplies to customer
•Prepare customer logistic performance report ( AFP Vs Actual sale – variance details, customer wise delivery performance report, schedule compliance report etc)
INVENTORY CONTROL
PLANNING
•Taking care of complete Kanban (B & C class components) &A class component commissioning activity for assembly line to keep the control on WIP of bought-out and in-house manufactured components.
•Ensure / take action decided to minimize direct material inventory (Raw material / WIP / imports / FG)
•Calculate next 4 month import child parts material procurement planning & give trigger based on the same to purchase.
•Establish procedures and supervises the annual physical inventory
Facility : Bus & Cateen Available
Job Location: Aurangabad MIDC
For More details call on 9765567509
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
7.00 LPA TO 8.00 LPA
Responsibilities:
1) Plan, organize, direct and run optimum day-to-day operations to exceed customers’ expectations.
2) Increase productivity, assets capacity and flexibility while minimizing unnecessary costs and maintaining current quality standards.
3) Allocate resources effectively and fully utilize assets to produce optimal results.
4) Implement strategies in alignment with strategic initiatives and provide a clear ...
1 Opening(s)
4.0 Year(s) To 10.0 Year(s)
9.00 LPA TO 10.00 LPA
Roles & Responsibilities
Translate application storyboards and use cases into functional applications
Design, build, and maintain efficient, reusable, and reliable code
Ensure the best possible performance, quality
Identify bottlenecks and bugs, and devise solutions to mitigate and address these issues
Help maintain code quality, organization, and automation
Desired Skills & Experience
Strong knowledge of C#, ASP.Net web ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
The job description is as below:
Candidate should mature enough to handle day to day activities to run the plant including all department and coordinating with all agencies required to run the plant.
Also good in human management.
To plan, direct, organize, coordinate, and control all the functions of the unit. To ensure ...
1 Opening(s)
20.0 Year(s) To 35.0 Year(s)
20.00 LPA TO 40.00 LPA
Responsibilities
Plan, organize, direct and run optimum day-to-day operations to exceed our customers’ expectations
Increase production, assets capacity and flexibility while minimizing unnecessary costs and maintaining current quality standards
Be responsible for production output, product quality and on-time shipping
Allocate resources effectively and fully utilize assets to produce optimal results
Implement strategies in alignment with ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
10.80 LPA TO 14.00 LPA
Responsibilities
Plan, organize, direct and run optimum day-to-day operations to exceed our customers’ expectations
Increase production, assets capacity and flexibility while minimizing unnecessary costs and maintaining current quality standards
Be responsible for production output, product quality and on-time shipping
Allocate resources effectively and fully utilize assets to produce optimal results
Implement strategies in alignment with ...
1 Opening(s)
7.0 Year(s) To 8.0 Year(s)
4.80 LPA TO 5.40 LPA
Plant Manager Job Duties
The Plant Manager will oversee all daily operations of the plant from production and manufacturing to ensuring policies and procedures are followed. They develop processes that will maximize stewardship, safety, quality and productivity.
Responsibilities
Plan, organize, direct and run optimum day-to-day operations to exceed our customers’ expectations
Increase production, assets ...
1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
50.00 LPA TO 72.00 LPA
Responsibilities
Plan, organize, direct and run optimum day-to-day operations to exceed our customers’ expectations
Increase production, assets capacity and flexibility while minimizing unnecessary costs and maintaining current quality standards
Be responsible for production output, product quality and on-time shipping
Allocate resources effectively and fully utilize assets to produce optimal results
Implement strategies in alignment with ...