22 Job openings found

1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 15.00 LPA
Key Responsibilities: • Team Lead for Installation/Erection, testing, commissioning of Ventilation Fans including Primary, Axial, Jet, Booster, Auxiliary fans in Underground Mines, Tunnels, Metro, Marine, Steel, Cement, thermal & other sectors. • Team Lead for Troubleshooting of issues related to Field Work for Ventilation Fans along with their full maintenance ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
We are looking for a Senior/Lead Process Design Engineer (Hydrogen/Decarbonisation Technologies) with experience ranging from 8 – 15 years.   Location - Mumbai/Gurgaon/Bengaluru   Job Responsibility:- To perform this role successfully, the candidate will be responsible for but not limited to the following: · Design and development of process systems ranging from concept through preliminary to ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Job Location- Bhosari Pune Rotatory Engineer / Package EngineerQualification: B E Mechanical with 5 to 10 years experience in Oil & gas industryRotating Equipment Specialist will develop activities for design, selection and follow up of rotating Machinery, ensuring the compliance with the QA/QC and HSE requirements.Tasks include: - Development Technology know how - Provide technical ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 6.00 LPA
We are looking for a Piping Engineer for our Ahmednagar Factory and Sites. Key Responsibilities: Design and develop piping layouts for sugar plant equipment including juice heaters, evaporators,condensers, pans, and boilers. Prepare Piping and Instrumentation Diagrams (P&IDs), General Arrangement (GA) drawings, andisometric drawings. Conduct stress analysis and ensure piping designs comply ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
8.00 LPA TO 10.00 LPA
 Project Leadership: Lead the overall project, including design, erection, commissioning, and providing engineering support during commercial production. Regulatory Compliance: Obtain necessary permits from local bodies (GIDC, GPCB) and ensure compliance during the project and commissioning phases. Project Planning: Develop detailed project plans and execute design standards in alignment with ...
1 Opening(s)
3.0 Year(s) To 12.0 Year(s)
4.00 LPA TO 6.00 LPA
1. Role Objective To ensure all solar power plant designs are technically accurate, execution-ready, and compliant with applicable standards. The Design Engineer acts as a design validator and quantity checker, responsible for reviewing vendor drawings, performing shading and yield analysis, verifying material quantities, and ensuring that every engineering decision supports ...
1 Opening(s)
5.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
Key Skills Required (Software knowledge / Specific skills ) Piping Layout 5+ 3D Modelling in S3D / E3D,Support modeling, Piping studies of Column, exchanger and Pump , compressor ,Review of Vendor drawings, Checking of Isometrics, preparation of SPM Data sheet Piping Stress 5+ Stress calculation in CAESAR II, Rack / ...
1 Opening(s)
15.0 Year(s) To 18.0 Year(s)
15.00 LPA TO 20.00 LPA
JOB DESCRIPTION:• Preparation of design deliverables such as Technical Specification of High Voltage and Low Voltage Equipment(Transformer, DG, Switchgear, UPS, CCTV, Smoke Detection, etc.,)• Preparation of calculation sheet such as UPS sizing, Plant Load List, Cable Schedule etc.• Preparation of detailed single line diagrams, Power/Control/LCS cable routing, Earthing Layout, and ...
2 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 5.40 LPA
Minimum 2+ years experience in tekla modeler & steel detailing. Prepare TEKLA Model, Engineering drawings, MTO for steel, foundations, and substructures for Piperack, Tech structures, equipment foundation, electrical buildings and underground sumps. Understanding of equipment vendor drawings and interface with other engineering disciplines. Apply expert knowledge of commonly used structural concepts, practices, within the ...
10 Opening(s)
8.0 Year(s) To 15.0 Year(s)
8.00 LPA TO 25.00 LPA
Electrical  Engineering (EHV System design The engineer should have knowledge of sizing and procurement support for Electrical equipment like Transformers, CT/VT, EHV/HV Equipment, EHV/HV and LV cable sizing, Battery & Battery chargers, UPS, cables,  busbar/conductor sizing calculation, short circuit force calculation,  earthing, lightning, lighting,  Technically sound. Review of Vendor drawings for ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile