1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.80 LPA TO 6.00 LPA
A Site Engineer for a fabrication plant manages on-site, day-to-day operations, focusing on safety, technical execution, and quality control of structural steel or PEB erection. Key duties include supervising erection teams, interpreting drawings, managing material inventory, ensuring compliance with standards (IS/AISC), and providing daily progress reports.
Key Responsibilities
Site Supervision: Oversee erection of main ...
1 Opening(s)
10.0 Year(s) To 18.0 Year(s)
8.00 LPA TO 10.00 LPA
Reduced rework percentage by taking in-process audit and mfg. audit.
Work as per the guideline of TPM/TS
Development and mfg. jig and fixture and establishment for production
Decided optimum cycle time for hydraulic and pneumatic testing
Co-Ordinate with PPC department for smooth production running
Set the robotic line as per the targets and balance the bottle neck operation
Overcome all the minor abnormality related to fixture during trial.
Set the TPM target for quality, maintenance, stores and production.
Arrange for all resources including raw materials, man power and facility required.
Handling overall press shop production for daily production targets
Overall responsibility of welding sub assembly of floor board and running board assembly
PROCESS follows with safety and through with safety and work permits.
Achieving the planned targets without Compromising the quality and quantity
Working as per various standards like ISO9001&Tsi6949-2002 system
Preparation of daily & Monthly reports
Co-Coordinating with Stores, QC, QA, Maint .In day to day activity
Awareness of seven QC tools to improve quality problems
Handling 4M for achieve desired production targets
Job Location : Waluj MIDC Aurangabad
For more details call on 9765567509
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 14.00 LPA
Overall experience in field of civil & Mechanical, PEB (Pre-Engineering building)
Fabrication work in MS and SS
Silo, hopper, bunker tanks fabrication.
BOQ preparation and cutting plan
Equipment and Piping Layout
Piping and pipe rack fabrication
Welding inspection and defect rectification work
Hot air duct fabrication, Insulation and expansion Joints
Acid proof brick lining and acid tiling work
Refractory ...
1 Opening(s)
12.0 Year(s) To 20.0 Year(s)
8.00 LPA TO 10.00 LPA
Dear Sir,
Hiring for Quality Head (QA) in Aurangabad Company Profile : Satin Finish Electroplating, Satin Finish Handle Bar, Sari Guard & Leg Guard, Trailing Arm Assembly, Auto Components, Manufacturer, Aurangabad, India The total sales revenue of the company for the financial year ending on March 2015 is INR 1100 million ...