1379 Job openings found

1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 4.50 LPA
Position: Senior Engineer Production  About the responsibilities of the position: The main activity of the production supervisor is that he is responsible for all the shop flower activities as peer following job profile. . Reporting to: Manager Educational Qualifications: Bachelor of Engineering in the stream of Mechanical / Production. Or Diploma in Engineering in ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.68 LPA TO 3.00 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)    Education: BE Electrical or Electronic / Electrical / Mechanical   Gender: Male   Responsibilities & Authority: •Capacity Planning for production of particular Shop Floor •To Monitor & do the production planning according to the customer schedule •To Monitor the Raw Material availability as per planning  •To Monitor monthly & weakly production planning •To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan. •To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor •To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan. •To prepare the dispatch plan as per customer schedule. •To release the dispatch plan to production dept. •To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan •To release a kitting plan to the store's department in accordance with the production plan. •To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date. •To communicate with the design department about the output of the process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production. •To maintain the record of the date and production order from which each change in engineering specifications is implemented in production. •To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.  •To release production orders in SAP as per plan and provide a cutting label for production. •To ensure timely confirmation of production in SAP. •To ensure that FG stocks in BSR coincide with that in SAP system. •To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on a daily basis •To ensure that packing of FG is done within shift time. •To ensure that daily production data update on display board and also update it in softcopy. •To Monitor & do measurement Of Production Objectives  •To Work in PP & MM module of SAP  •To Maintain the stock in SAP  •To Match the physical raw material stock & SAP stock  •Play an important role in WIP (STOCK) as coordinator for production & account dept. •Monitor Schedule Vs. Compliance of production •To take responsibility as an associate member in KK pillar. •Monitoring Daily Attendance & data of operator, also coordinate with HR dept. for the same.  •OEE monitoring. •Plan v/s Actual monitoring. •Scrap monitoring. •Monitoring TPM activity of production department. •Monitoring ISO & TS activity of production department. •To coordinate with purchase, Store & account dept. for new material requirement •To communicate with supervisors & line leaders of the respective section (ACC, LPC, ASSEMBLY) •To maintain KAIZEN & coordinate with QMS Dept. for the same •To prepare MRM Presentation •To make stage wise identification   Job Location: Shendra MIDC, Aurangabad   for more details call on 7249840222 / 9765567505
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.60 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)    Education: BE Electrical or Electronic   Gender: Female   Responsibilities & Authority: •Capacity Planning for production of particular Shop Floor •To Monitor & do the production planning according to the customer schedule •To Monitor the Raw Material availability as per planning  •To Monitor monthly & weakly production planning •To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan. •To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor •To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan. •To prepare the dispatch plan as per customer schedule. •To release the dispatch plan to production dept. •To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan •To release a kitting plan to the store's department in accordance with the production plan. •To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date. •To communicate with the design department about the output of process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production. •To maintain the record of the date and production order from which each change in engineering specifications is implemented in production. •To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.  •To release production orders in SAP as per plan and provide a cutting label for production. •To ensure timely confirmation of production in SAP. •To ensure that FG stocks in BSR coincide with that in SAP system. •To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on the daily basis •To ensure that packing of FG is done within shift time. •To ensure that daily production data update on display board and also update it in softcopy. •To Monitor & do measurement Of Production Objectives  •To Work in PP & MM module of SAP  •To Maintain the stock in SAP  •To Match the physical raw material stock & SAP stock  •Play an important role in WIP (STOCK) as coordinator for production & account dept. •Monitor Schedule Vs. Compliance of production •To take responsibility as associate member in KK pillar. •Monitoring Daily Attendance & data of operator, also co-ordinate with HR dept. for the same.  •OEE monitoring. •Plan v/s Actual monitoring. •Scrap monitoring. •Monitoring TPM activity of production department. •Monitoring ISO & TS activity of production department. •To coordinate with purchase , Store & account dept. for new material requirement •To communicate with supervisors & line leaders of respective section (ACC , LPC, ASSEMBLY) •To maintain KAIZEN & coordinate with QMS Dept. for the same •To prepare MRM Presentation •To make stage wise identification   Job Location: Chitegaon MIDC , Aurangabad   for more details call on 7249840222
1 Opening(s)
0 To 1.0 Year(s)
1.50 LPA TO 2.00 LPA
Qualification : B.E / DME (Electrical/ Electronics)  Experience:  0-1Years Key Responsibilities        Technical Feasibility Documentation     1. Part manufacturing feasibility, machining feasibility, forging manufacturing feasibility, quantum raw materials required. Defining packaging standards, DPAR- design product availability review. New Product Production Supervision 1. Supervising the production activity of First 3 batches to ensure smooth production process and lower PPM. Setting approval ...
1 Opening(s)
9.0 Year(s) To 15.0 Year(s)
8.00 LPA TO 10.00 LPA
Job opening for: Maintenance Manager-Machine Shop Education: Diploma / BE/ ME in Mechanical Engineering Experience: 9-15 years in Machine Shop Job Profile: Maintenance plan &  Preventive maintenance activity for m/c like VMC, CNC, HMC,  Attending Regular operation About Utility; like- D.G. set of 750 KVA; 500KVA; Compressor (Atlas Capco, Kaiser); cooling tower. Changeover of MSEDCL supply ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 8.00 LPA
Job Profile Target achievement Monthly, quarterly and annually, product wise and unit wise, Area wise Promotional activities Design Monitor and run effective promotional plans. Budget management Design incentive plans for field force is done within the stipulated time and communicated HO. Plan and execute control own and field staff tour programs , expense statements Design field staff KRA, Training, ...
3 Opening(s)
6.0 Year(s) To 12.0 Year(s)
5.00 LPA TO 6.50 LPA
Job Profile Position – Regional Initiator (1st Line Manager) at Kochi, Guwahati & Vijaywada. Responsibilities  Target achievement Monthly, quarterly and annually, product wise and unit wise, Area wise Promotional activities Design Monitor and run effective promotional plans. Budget management Design incentive plans for field force is done within the stipulated time and communicated HO. Plan and execute control own and ...
1 Opening(s)
2.5 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
Job Title :Project Engineer Division/ Functions :  RFQ Cell Dept Direct reporting To :  DGM Qualification : B.E (Mechanical) / DME / ITI Experience:  3-5 Years Key Responsibilities        Technical Feasibility Documentation     1. Part manufacturing feasibility, machining feasibility, forging manufacturing feasibility, quantum raw materials required. Defining packaging standards, DPAR- design product availability review. New Product Production Supervision 1. Supervising the production ...
3 Opening(s)
2.0 Year(s) To 15.0 Year(s)
1.80 LPA TO 4.50 LPA
Interview Date: 04 to 10 Jan 2019 Position: Production Engineer (2 No) About the responsibilities of the position: The main activity of the production supervisor is that he is responsible for all the shop flower activities as peer following job profile Reporting to: Manager Educational Qualifications: Bachelor of Engineering in the stream of Mechanical / ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 4.50 LPA
Job Profile Candidates having experaince in diabetology/cardiology can only apply. Target achievement Monthly, quarterly and annually, product wise and unit wise, Area wise Promotional activities Design Monitor and run effective promotional plans. Budget management Design incentive plans for field force is done within the stipulated time and communicated HO. Plan and execute control own and field staff tour programs ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile