1 Opening(s)
15.0 Year(s) To 16.0 Year(s)
3.60 LPA TO 6.00 LPA
An Electrician/Foreman in a power plant is responsible for overseeing the installation, maintenance, repair, and testing of high-voltage systems, generators, motors, and electrical equipment to ensure maximum uptime, safety, and operational efficiency. They lead crews, interpret blueprints, and troubleshoot complex electrical issues, ensuring strict compliance with safety codes and plant regulations.
Key ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
12.00 LPA TO 15.00 LPA
Having Experience of 15 to 20 years in Design & Engineering of Electrical system in Oil & Gas
sector.
Having sound knowledge of HV/LV Power distribution system (i.e. Preparation and finalization
of key SLD, interconnection diagram, SCADA, DCS/PLC interfaces etc.).
Having sound knowledge of Electrical equipment (like HV/LV Switchgear, Transformer,
AC/DC UPS, EDG set, motor, ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 5.00 LPA
1.Ensure Sales activities for the given region for Industrial Automation products, LV Panel and Trading products (LV Switchgear, Panels, Bus Ducts, MCC, PCC, Power Distribution Panels, Siemens Automation, PLC, SCADA, Drives etc.)
2. Generating Business from Existing Customer
3. Developing New Customer
4. Payment Collection Target Achievement (weekly/monthly/quarterly/annually)
5. Customer Feedback and support.
6. Error ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.60 LPA TO 3.60 LPA
Urgent Requirement of Instrument Engineer for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed of progress.
Turbine control system testing, tweaking and commissioning
Plant DCS system (Boiler and BOP) testing, ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.50 LPA
Post: Assistant Quality Manager
Company Profile: Gradually the company expanded its customer base to include the Electrical Switchgear industries.
It was in the year 2004, that the company expanded its product range to include electrical enclosures like MCB distribution boxes, Concealed metal boxes, and main switches.
Today, after 25 years the company has grown to a full-fledged manufacturing facility ...
1 Opening(s)
13.0 Year(s) To 20.0 Year(s)
10.80 LPA TO 12.00 LPA
Urgent Requirement of Electrical Head-Maintenance for SMS Division at Raipur Location.3
Operation of HT/LT Panels, switchgear, Transformer, MCC/PCC panel, Motors Starters, Timers.
Preventive and general Electrical maintenance as per schedule.
Parallel operation of alternators and their load sharing.
Designing, testing, wiring, servicing and commissioning of all type of control and power panel i.e. MCC, ...
3 Opening(s)
1.0 Year(s) To 5.0 Year(s)
1.44 LPA TO 1.80 LPA
Position: Electrician
Dip. / ITI - (Electrical) with Wireman License (2- 5Year experience)
Job Profile:
1) 24 X 7 One Electrician will be available at Sub-stations 1
2) Operation of HT/LT Electrical Switchgear.
3) Attain all general Electrical Work, Electrical Break Down in Utility area.
4) Preventive Maintenance activities for Electrical Panels / Transformers, DBs.
5) ...
5 Opening(s)
0 To 4.0 Year(s)
1.20 LPA TO 1.80 LPA
Post: Lab Chemist
Qualification: BSc Chemistry and above
Company Profile: Gradually the company expanded its customer base to include Electrical Switchgear industries.
It was in the year 2004, that the company expanded its product range to include electrical enclosures like MCB distribution boxes, Concealed metal boxes and main switches.
Today, after 25 years the company has grown to a full-fledged manufacturing ...
2 Opening(s)
1.0 Year(s) To 4.0 Year(s)
1.44 LPA TO 1.80 LPA
Hiring for Production Supervisor (Assembly Shop)
Company Profile: Gradually the company expanded its customer base to include Electrical Switchgear industries.
It was in the year 2004, that the company expanded its product range to include electrical enclosures like MCB distribution boxes, Concealed metal boxes and main switches.
Today, after 25 years the company has grown to a full-fledged manufacturing ...
3 Opening(s)
1.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.40 LPA
Hiring for Design Engineer
Company Profile: Gradually the company expanded its customer base to include Electrical Switchgear industries.
It was in the year 2004, that the company expanded its product range to include electrical enclosures like MCB distribution boxes, Concealed metal boxes and main switches.
Today, after 25 years the company has grown to a full-fledged manufacturing facility of ...