276 Job openings found

1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
Not Disclosed by Recruiter
Qualification: BE / Diploma in civilExperience: 3 to 7 yrs in construction site supervision for Residential projects.Site location: Narayanpur in Pune (on Satara road) - Near Balaji temple, Narayanpur  Job Description:Coordination with various vendors, follow up with all vendors for speed work & for procurement of required materials at site.Coordination with Internal ...
1 Opening(s)
7.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
Qualification: Diploma / BE in civilExperience: 7 to 15 years or more experience in building works (RCC and finishing)Must be able to read and write English, also has competency of local language and able to talk in Hindi Site location: Sedashiv nagar, Jayanagar in Bangalore Primary KPAs Coordination with various Vendors –follow up with ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 6.00 LPA
Hiring for PPC Assistant Manager in Corrugated Box  / Cartoon Manufacturing Industry Position: PPC Assistant Manager Educational Qualifications: Any Graduate. Desired Experience: Min 4 year experience in a Manufacturing company preferably in Packaging / Corrugated Box  / Cartoon Manufacturing Industry with SAP Salary: Rs. up to 6.00 PLA  Skills Set required/Job Profile : Preparing Pert charts for production planning in line with client ...
2 Opening(s)
2.0 Year(s) To 4.0 Year(s)
2.40 LPA TO 2.60 LPA
Position: PPC Engineer Educational Qualifications: DME/BE or Graduate. Desired Experience: Min 2 year experience in a Manufacturing company preferably in Machine Shop / Heavy Machineries industry with SAP Salary: up to 2.6 PLA  Skills Set required/Job Profile : PPC/Purchase Job profile. Working on SAP modules such as PP and MM modules Preparing Pert charts for production planning in line with client ...
1 Opening(s)
3.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 3.50 LPA
JOB TITLE: Lab Assistant POSITION: Executive DEPARTMENT: Production BAND: 6B REPORTS TO: Functional Reporting: Manager – Operations Administrative Reporting: Sr. Manager - Operations Compensation: 2.50 lacs pa to 3.50 lacs pa. Plus accommodation reimbursement as per actual rent agreement (maximum Rs 3000/- per month). Plus Group Mediclaim / Personal Accident Policy as per Company norms. ) Work experience: 4-8 yrs Education: B.SC – Wine Technology / ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.68 LPA TO 3.00 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)    Education: BE Electrical or Electronic / Electrical / Mechanical   Gender: Male   Responsibilities & Authority: •Capacity Planning for production of particular Shop Floor •To Monitor & do the production planning according to the customer schedule •To Monitor the Raw Material availability as per planning  •To Monitor monthly & weakly production planning •To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan. •To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor •To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan. •To prepare the dispatch plan as per customer schedule. •To release the dispatch plan to production dept. •To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan •To release a kitting plan to the store's department in accordance with the production plan. •To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date. •To communicate with the design department about the output of the process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production. •To maintain the record of the date and production order from which each change in engineering specifications is implemented in production. •To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.  •To release production orders in SAP as per plan and provide a cutting label for production. •To ensure timely confirmation of production in SAP. •To ensure that FG stocks in BSR coincide with that in SAP system. •To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on a daily basis •To ensure that packing of FG is done within shift time. •To ensure that daily production data update on display board and also update it in softcopy. •To Monitor & do measurement Of Production Objectives  •To Work in PP & MM module of SAP  •To Maintain the stock in SAP  •To Match the physical raw material stock & SAP stock  •Play an important role in WIP (STOCK) as coordinator for production & account dept. •Monitor Schedule Vs. Compliance of production •To take responsibility as an associate member in KK pillar. •Monitoring Daily Attendance & data of operator, also coordinate with HR dept. for the same.  •OEE monitoring. •Plan v/s Actual monitoring. •Scrap monitoring. •Monitoring TPM activity of production department. •Monitoring ISO & TS activity of production department. •To coordinate with purchase, Store & account dept. for new material requirement •To communicate with supervisors & line leaders of the respective section (ACC, LPC, ASSEMBLY) •To maintain KAIZEN & coordinate with QMS Dept. for the same •To prepare MRM Presentation •To make stage wise identification   Job Location: Shendra MIDC, Aurangabad   for more details call on 7249840222 / 9765567505
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.60 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)    Education: BE Electrical or Electronic   Gender: Female   Responsibilities & Authority: •Capacity Planning for production of particular Shop Floor •To Monitor & do the production planning according to the customer schedule •To Monitor the Raw Material availability as per planning  •To Monitor monthly & weakly production planning •To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan. •To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor •To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan. •To prepare the dispatch plan as per customer schedule. •To release the dispatch plan to production dept. •To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan •To release a kitting plan to the store's department in accordance with the production plan. •To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date. •To communicate with the design department about the output of process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production. •To maintain the record of the date and production order from which each change in engineering specifications is implemented in production. •To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.  •To release production orders in SAP as per plan and provide a cutting label for production. •To ensure timely confirmation of production in SAP. •To ensure that FG stocks in BSR coincide with that in SAP system. •To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on the daily basis •To ensure that packing of FG is done within shift time. •To ensure that daily production data update on display board and also update it in softcopy. •To Monitor & do measurement Of Production Objectives  •To Work in PP & MM module of SAP  •To Maintain the stock in SAP  •To Match the physical raw material stock & SAP stock  •Play an important role in WIP (STOCK) as coordinator for production & account dept. •Monitor Schedule Vs. Compliance of production •To take responsibility as associate member in KK pillar. •Monitoring Daily Attendance & data of operator, also co-ordinate with HR dept. for the same.  •OEE monitoring. •Plan v/s Actual monitoring. •Scrap monitoring. •Monitoring TPM activity of production department. •Monitoring ISO & TS activity of production department. •To coordinate with purchase , Store & account dept. for new material requirement •To communicate with supervisors & line leaders of respective section (ACC , LPC, ASSEMBLY) •To maintain KAIZEN & coordinate with QMS Dept. for the same •To prepare MRM Presentation •To make stage wise identification   Job Location: Chitegaon MIDC , Aurangabad   for more details call on 7249840222
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Post: Maintenance Shift In charge    Education: DEE / BE Electrical    Experience: Min 6 Years in Rolling Mill / Steel Industry   Job Profile: Working in a general shift, make daily job planning, manpower planning as per rolling section. Responsible for doing pm-1(preventive maintenance) jobs .shift schedule and daily checklist follow-up, Responsible for Electrical & Automation Maintenance of 600-meter long HAPL Line consist of Entry section, RCM Welder,6-HI Cold / Hot Rolling Mill, Furnace, Scale Breaker, Shot- Blaster, Pickling, Entry-Mill & Exit Loppers & exit Section. Responsible for handling all maintenance related activities of ABB PLC's,AC Drives,AC Motors and DCS 800xA System and LT and HT switch Gears used in the plant  Knowledge in logic solving in control panels & various interlocking schemes required for automation and analyzing all drawings related to automation & control systems. Instrumental in coordinating with various internal departments and contractor personnel for safe execution of shutdowns and ensuring implementation of routine/preventive/breakdown maintenance schedules of the system to increase machine uptime, equipment reliability thereby. Responsible for maintaining 5S activity & safety measures regularly To co-ordinate with the Electrical contractor for Execution, Erection, and Commissioning Basic Knowledge of Sheet CENTER GUIDE and STEERING UNIT, EDGE System provided by EMG. Knowledge of hardware Communication between Drives, PLC and HMI’s through Fiber Optic and Profibus. Knowledge of Gauge Measurement system provided by IMS used at 6 HI in Line Mill. Responsible for keeping a record of the daily power consumption, daily delay report, spare parts list of the plant. Basic Knowledge about  Control-Logix / Compact-Logix systems of Allen-Bradley PLC (Rockwell Automation). Identifying NetLinx networks for use in a Logix5000 System used for in-line Welder. Successfully  accomplished Erection, testing, Commissioning of ARP System(Acid Recovery Process To maintain records, logbook for the job carried out. Organize safety meetings & give on the Job training to my subordinates To ensure good housekeeping in the area and the shop floor. Take participate in IMS  internal audit  and prepare all supporting document To maintain a record of bypass of trip & interlock as per the procedures. Working on SAP (Plant Maintenance Module).   Job Location: Chitegaon MIDC, Aurangabad Maharashtra   For more details call on 7249840333 / 9765567506   Send CV on career@paradiseplacement.co.in
2 Opening(s)
10.0 Year(s) To 20.0 Year(s)
8.00 LPA TO 10.00 LPA
Responsible for planning, site supervision, quality control and assurance as per MORTH / Intentional Standards, progress monitoring, setting out, field investigation, quantity estimation, cost estimation, analysis of rates, measurement of work, preparation of running / final bill, carrying out review with contractor / client, . Supervision and project implementation under ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.30 LPA
KEY RESPONSIBILITY: Maintenance activities of hydraulics/ Robotics/electric & Mechatronic  Maintenance of injection molding machine & SPM machine Execution of PM & PDM as per schedule, Analysis of breakdowns Execution of TPM &PM pillar Activities Energy saving project Attending major breakdown maintenance Utility includes transformer, HT/LT switchgear, Air Compressor, DG set, pump house Head over crane, chiller, cooling tower, lux measurement. Firefighting system, R.o plant Handling documentation of executive & planned maintenance Execution of TBM CBM as per schedule  Study of detoriotive components Applications of kaizen Troubleshooting and attending breakdown maintenance  Housekeeping maintenance related to department modification and spare management Implementing ISO/TS16949, 5’s and FORMELQ To improve machine uptime (MTBF) To improve machine repairs time (MTTR) Maintained machine history card To handle electrical supply system I.e.HT &Lt side  Maintenance of hydraulic system/ pneumatic system/ to develop ladder logic of PLC, AC, DC & Servo Drive Keeping spare in ready operational condition and maintenance of utility equipment Preparing Machine Check List: sm 450t, sm 350, Magna150t, Magna 200t, htw90, htw60 & FOR 50TH machine Capable of handling electromechanical device Is. robot, chiller, ultrasonic welding m/c Presentation of monthly PRM Taking outside service appointment & spare management Recording Daily Activity Report for Meter Reading (main transformer, all panel) &Organize receivable &commercial Documents against invoice Managing maintenance of machine control panel, assembly line, plant lighting, street lighting, & all electrical work in plant as well as of communication buses RS232, RS485, DH485&Modbus Working on welding machine, grinding machine, oil filter machine water chiller, rivet gun, hydraulic pneumatic machine, DG set, exhausts fan & dehumidifier, injection model and plastic mold Job Location : Waluj MIDC, Aurangabad For more details call on 9765567506  

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile