1 Opening(s)
5.0 Year(s) To 13.0 Year(s)
Not Disclosed by Recruiter
Main Responsibilities
1) Review the system designs, Drawings and specifications to ensure compliance with project requirements and industry standards.
2) Assist in the follow up of materials procurement for the installation and operation of solar systems, including solar panels, inverters, mounting structures and electrical components from EPC.
3) Joint inspection of material receipts at site by ...
1 Opening(s)
10.0 Year(s) To 20.0 Year(s)
Not Disclosed by Recruiter
Main Responsibilities
1) Review the system designs, Drawings and specifications to ensure compliance with project requirements and industry standards.
2) Assist in the follow up of materials procurement for the installation and operation of solar systems, including solar panels, inverters, mounting structures and electrical components from EPC.
3) Joint inspection of material receipts at site by ...
3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 3.60 LPA
Job Description:
Identify Buyer of Power in Industries for Long term Open Access
Develop Market for Solar 3rd Party Power Plants
Communicate with Government and Statutory Stakeholder
Create a Database for High Power Consumption Industries
Follow up with the customer and Close the Deal
Reporting to the Board for progress
Coordinate with Engineering and Sales Teams
1 Opening(s)
5.0 Year(s) To 15.0 Year(s)
9.00 LPA TO 11.00 LPA
1. Should be experienced in design and engineering in Solar industry. 2. Should have a individual contributor, proactive, 3. Should have good hold in AutoCad, Google Sktech and PVsyst etc design softwares 4. Smart, Confident, team player"
KRA
Analysis of Site Survey ReportDetailed Bill of Material Preparation, Costing of solar power plantsElectricity ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
18.00 LPA TO 20.00 LPA
Unit Solar Power BusinessFunction Quality
The Field Quality Manager will be fully responsible to ensure QA in entire construction site during the project execution including material supply quality (at site) & execution quality.On Site FQA representatives will report to FQ Manager for day-to-day Quality compliance & issues captured. He will be responsible for ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
15.00 LPA TO 18.00 LPA
Unit Solar Power BusinessFunction Quality
The Field Quality Manager will be fully responsible to ensure QA in entire construction site during the project execution including material supply quality (at site) & execution quality.On Site FQA representatives will report to FQ Manager for day-to-day Quality compliance & issues captured. He will be responsible for ...
2 Opening(s)
5.0 Year(s) To 10.0 Year(s)
20.00 LPA TO 20.00 LPA
Essential Duties:
1. Site visit• Site Measurement: Roof detail measurement, cable route marking, termination point marking• Propose all component location to client.2. People co-ordination• Updating daily work to reporting manager3. Detailed Engineering• Detailed site visit report preparation• Understanding the OTM, Scope Matrix and KOM documents for the project• Preparation of shadow ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
15.00 LPA TO 18.00 LPA
Unit Solar Power BusinessFunction Quality
The Field Quality Manager will be fully responsible to ensure QA in entire construction site during the project execution including material supply quality (at site) & execution quality.On Site FQA representatives will report to FQ Manager for day-to-day Quality compliance & issues captured. He will be responsible for ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
10.00 LPA TO 10.00 LPA
Unit Solar Power BusinessFunction Quality
The Field Quality Manager will be fully responsible to ensure QA in entire construction site during the project execution including material supply quality (at site) & execution quality.On Site FQA representatives will report to FQ Manager for day-to-day Quality compliance & issues captured. He will be responsible for ...
1 Opening(s)
12.0 Year(s) To 20.0 Year(s)
18.00 LPA TO 24.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of wind business in accordance ...