1 Opening(s)
6.0 Year(s) To 7.0 Year(s)
5.00 LPA TO 6.00 LPA
To Plan the Preventive Maintenance Schedule for all machines of the plant and set the check points of machines during the preventive maintenance as per the machine manual and as per working environment.
Installation of Conveyor lines (Realty Engineering) for SDA, Water Purifiers, and Iron.
Routine Maintenance of Conveyor lines i.e. motor ...
12 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.20 LPA TO 1.80 LPA
JOB DESCRIPTION:
Civil Supervisors monitor civil construction projects. They oversee activities such as building bridges, repairing highways and doing construction on airports. While Civil Supervisors may have an office, much of their time is spent on construction sites to make sure all parties involved are performing up to par. They are ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
0.00 LPA TO 15.00 LPA
Requirements
• A minimum of 8 years’ experience in conducting steam trap surveys, trap management services, steam & condensate accessories sales in Oil & Gas, Petro-chemical, Chemical, Fertilizer, Power Industry.
• Well familiar with the instruments used in the field of trap testing – Ultrasonic Leak Detector, IR Temperature Sensor.
• Skilled in ...
1 Opening(s)
7.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Revit Mep Modeler – Mechanical DepartmentResponsibilities? Obtain brief of the task assigned? Understand task assigned and expected commitments? Provide the inputs to Design department to prepare Drawing/Document schedule? Preparation of Man-hours required? Draft process equipment layout in consultation with process engineer? Draft utility area and service floor blocks for area ...
4 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
Company Vardhman Group Unit / Division Vardhman Acrylics Limited Location of Role Jhagadia, Bharuch, Gujrat Role, job contents, scope, responsibilities ITI-RFM with 2 to 3 years experience in Brine Chiller, water CHiller, water absorption matching, Utility Air Compressor activities, Nitrogen compressor and cooling tower. ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 9.00 LPA
Sr. No. Details1responsible for smooth running of Effluent treatment plant (ETP), ReverseOsmosis (RO), Multiple effect Evaporators (MEE), Agitated Thin Film Dryers(ATFD) and hazardous waste disposal.2 Ensure Operational cost reduction by optimizing power, manpower, utilitiesand chemical consumption.3 Treatment techniques in vision of quality/quantity (High TDS/ COD, Processeffluents etc.)4 Conduct environmental programs ...
4 Opening(s)
5.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Eseskay Projects LLP -: An Environmental Engineering, Energy Conservation, Energy & Infra Development Project firm is managed by Entrepreneurs who have around 3 decades of experience in executing large Projects in the field of infrastructure and Environmental management and in design and execution of water and wastewater treatment plants for ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 6.00 LPA
Job Description of a Boiler Operator
Boiler operators typically work in facilities like power plants or boiler, engine, and mechanical rooms. They can be responsible for all of the systems that generate heat or electricity in a facility. Some of the equipment that they are responsible for includes:
Low-pressure boilers
High-pressure boilers
Power boilers
Steam ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
7.00 LPA TO 12.00 LPA
Liaison with all government/semi-government departments.
To Prepare Documentation for Representation to BMC/UD Department/ CTS Department & various other governmental departments Responsible for obtaining all necessary permissions & approvals to be taken from government/ statutory authorities before the start of the project, during the project, and at the completion ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 6.00 LPA
Actual Vs. Documentation
Microbial limit test finish product (A) Second day, (B) Forth day.
Microbial limit test water sample(A) Second day (B) Forth day.
Microbial limit test swab test(A) Second day (B) Forth day.
Grovåh promotion test (A) Mannitol salt agar, (B) Cetrimide agar, (C) MacConkey's Broth,
(D) Rappaport Vassiliadis Salmonella Enrichment Broth, (E) Nutrient ...