2 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 3.00 LPA
Responsibilities:
Perform installation, maintenance, and repair of mechanical equipment including pumps, compressors, conveyors, and other machinery used in the sponge iron production process.
Conduct routine inspections to identify and resolve any mechanical issues before they escalate, ensuring minimal downtime.
Troubleshoot equipment malfunctions and implement corrective actions to ensure continuous operation.
Collaborate with other maintenance ...
2 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.00 LPA TO 2.40 LPA
Responsibilities:
Perform installation, maintenance, and repair of mechanical equipment including pumps, compressors, conveyors, and other machinery used in the sponge iron production process.
Conduct routine inspections to identify and resolve any mechanical issues before they escalate, ensuring minimal downtime.
Troubleshoot equipment malfunctions and implement corrective actions to ensure continuous operation.
Collaborate with other maintenance ...
10 Opening(s)
8.0 Year(s) To 14.0 Year(s)
Not Disclosed by Recruiter
Design engineer
6-15 years
BE/ Btech mechanical
job location- Vadodara
The Mechanical engineers should have experience in basic and Detail design of Power Plant, Waste to Energy Plant or Water Treatment plant.
The engineer should have good knowledge of Main Steam Cycle of super critical plant, Combined cycle power plant, Feed water Pumps, Condenser, Gas ...
1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.40 LPA
Job Description -
02/01/2024
HPS/2024/3
Mechanical Maintenance Engineer
Male
1
3 to 4
DME/B.E/B.Tech Mechinical
A maintenance engineer's job is to ensure that machinery continues to function properly.
This means that they need to have extensive knowledge of how machinery works and how to repair it. This can include knowing how to read and interpret technical manuals, schematics and diagrams.
Responsible ...
4 Opening(s)
3.0 Year(s) To 7.0 Year(s)
4.00 LPA TO 5.00 LPA
Operation / Maintenance of Utilities like air compressors, air dryers, Vapor compression and vapor absorption chillers, cooling towers, Nitrogen plant, etc. Day to day Preventive / Predictive / Breakdown maintenance of chemical / pharma /Textile plant machines like pumps, mech. seals, gear boxes, agitators ,blowers , reactors, etc. Handling ...
2 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.80 LPA TO 3.00 LPA
Supervision for Maintenance Team of Welders, Fitter, Foremen and other helpers
Supervision for Breakdown Maintenance, Preventive Maintenance and Overhaul Maintenance Activities.
Preparation for Day to Day Work Activities.
Preparation for Reports for Breakdown Maintenance, Preventive Maintenance and Overhaul Maintenance.
Supervision for Maintenance work related to Melting Furnace and Refractory.
Supervision for Maintenance Work Related to ...
2 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.50 LPA
Operation / Maintenance of Utilities like air compressors, air dryers, Vapor compression and vapor absorption chillers, cooling towers, Nitrogen plant, etc. Day to day Preventive / Predictive / Breakdown maintenance of chemical / pharma /Textile plant machines like pumps, mech. seals, gear boxes, agitators ,blowers , reactors, etc. Handling ...
1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 6.50 LPA
Major Break down Extrusion machine analysis & Reduce the Break Down.
Preventive Maintenance schedule according work. & Safety Awareness.
Involved in foundry casting mould alignment work
Result oriented, able to work independently as well as group member
Maintaining E.O.T cranes & compressors
Maintaining and servicing all hydraulic pumps & valves
Maintenace of CNC VMC Machine
press shop ...
1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 6.00 LPA
Maintenance the 0.5HP to 40HP Induction motors and electrical panels, L.T. ControlSwitch, 2-ACB, 1-VCB, forward & reverse motor control to hoist. Responsible for all type of maintenance works. Maintaining the records of Electricity Meter. 2 X 350kW electrical furnace & furnace panel. 5kW hydraulic pump and motor & 5kW water ...
10 Opening(s)
2.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 5.00 LPA
1.
Operation of Gas fired Boiler
2.
Operation of Gas fired TFH
3.
Operation of Water & Brine Chiller
4.
Operation of Reciprocating & Screw Air Compressors
5.
Monitoring Utility equipment parameter and logging into log book
6.
Keeping Utility machineries clean & in good condition
7.
Updating daily report for utility parameters
8.
Quarterly thermic fluid oil sampling for statutory requirement
9.
Boiler Moberly testing and ...