1 Opening(s)
12.0 Year(s) To 20.0 Year(s)
18.00 LPA TO 18.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of Solar business in ...
1 Opening(s)
12.0 Year(s) To 20.0 Year(s)
18.00 LPA TO 24.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of wind business in accordance ...
1 Opening(s)
12.0 Year(s) To 20.0 Year(s)
18.00 LPA TO 24.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of wind business in accordance ...
1 Opening(s)
12.0 Year(s) To 18.0 Year(s)
18.00 LPA TO 24.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of solar business in ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
10.00 LPA TO 12.00 LPA
Position: Asst. Manager Mechanical Engineer (Greenfield Project)
Location: Daman
Experience: 10-12 Years
Industries: Pharma
Responsibilities:
Autoclaves, Medial fills
Vial washing filling sealing line
PFS filling and sealing line
Cartridge filling and sealing line
Lyophilizes and isolators
CIP SIP, visual inspection , Packing machines blister and cartooning, serialization, labeling , Manufacturing skid etc.
Above machine ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
6.00 LPA TO 8.00 LPA
Key Responsibilities: • Process engineering for project activities – PFDs, P&IDs, equipment sizing, mass balance • Support feasibility studies, conceptual & detailed engineering • Coordination with consultants, vendors & internal teams • Ensure compliance with process safety & statutory norms • Support installation, commissioning & start-up activities • Participate in ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
18.00 LPA TO 20.00 LPA
Greenfield & Brownfield project experience. Electrical experience. chemical industry experience. detail Job description not provided by company.
ExperiencesinDetailEngineeringlikeloadesti mation,voltagedrop calculations,cablesizing,circuitbreakerselection,earthingselectionand calculations,Regulatoryrequire mentsandsafetyfeatures. Experiences in green and brown field projects, basic and detail engineering, Procurement, Installations, Testing and commissioning of electrical equipment in Petrochemical, chemical, Rubber, Automobile industries. ReviewandApprovalofvariousDesign,Engineering&Construction documentsI.e.,Keyone-linediagra ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
Not Disclosed by Recruiter
The Job description is as below:
Job Objective
We are seeking a skilled and detail-oriented Civil Engineer to support the planning, execution, and supervision of civil works for a Greenfield project. The ideal candidate will have hands-on experience in site execution, structural detailing, and AutoCAD-based drafting, with a strong of industrial construction ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
16.00 LPA TO 20.00 LPA
About the Job
An experienced project manager will manage Project Peacock, which includes building the facility and setting up greenfield operations.
Effectively coordinate people and processes to deliver Project Peacock on time and ensure it meets the desired results. You will serve as the primary contact for all aspects of the project's ...
1 Opening(s)
7.0 Year(s) To 10.0 Year(s)
10.00 LPA TO 12.00 LPA
Key Responsibilities:Project Planning & ControlsOwn the site execution plan, micro‑schedule, and S‑curve; develop and track weekly look‑ahead plans.Establish and run daily/weekly progress review meetings (internal + contractors); publish DPR/WPR/MPR and executive dashboards.Drive critical path items, interface management (civil–mechanical, electrical–instrumentation), and change control.Budget tracking: RA bill verification, BOQ/BOM reconciliation, contractor productivity, ...