1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.30 LPA
KEY RESPONSIBILITY:
Maintenance activities of hydraulics/ Robotics/electric & Mechatronic
Maintenance of injection molding machine & SPM machine
Execution of PM & PDM as per schedule, Analysis of breakdowns
Execution of TPM &PM pillar Activities
Energy saving project
Attending major breakdown maintenance
Utility includes transformer, HT/LT switchgear, Air Compressor, DG set, pump house Head over crane, chiller, cooling tower, lux measurement. Firefighting system, R.o plant
Handling documentation of executive & planned maintenance
Execution of TBM CBM as per schedule
Study of detoriotive components
Applications of kaizen
Troubleshooting and attending breakdown maintenance
Housekeeping maintenance related to department modification and spare management
Implementing ISO/TS16949, 5’s and FORMELQ
To improve machine uptime (MTBF)
To improve machine repairs time (MTTR)
Maintained machine history card
To handle electrical supply system I.e.HT &Lt side
Maintenance of hydraulic system/ pneumatic system/ to develop ladder logic of PLC, AC, DC & Servo Drive
Keeping spare in ready operational condition and maintenance of utility equipment
Preparing Machine Check List: sm 450t, sm 350, Magna150t, Magna 200t, htw90, htw60 & FOR 50TH machine
Capable of handling electromechanical device Is. robot, chiller, ultrasonic welding m/c
Presentation of monthly PRM
Taking outside service appointment & spare management
Recording Daily Activity Report for Meter Reading (main transformer, all panel) &Organize receivable &commercial
Documents against invoice
Managing maintenance of machine control panel, assembly line, plant lighting, street lighting, & all electrical work in plant as well as of communication buses RS232, RS485, DH485&Modbus
Working on welding machine, grinding machine, oil filter machine water chiller, rivet gun, hydraulic pneumatic machine, DG set, exhausts fan & dehumidifier, injection model and plastic mold
Job Location : Waluj MIDC, Aurangabad
For more details call on 9765567506
1 Opening(s)
8.0 Year(s) To 14.0 Year(s)
6.00 LPA TO 7.00 LPA
Maintenance Activities
As a Maintenance Executive (HOD) representative to Plant head (GM)
Maintenance of Plastic injection molding press ,assembly machines, utility machines,tool room machines
Responsible for breakdown targets ,PM planning and execution.
Spare part planning with critical spare and inventory control .
Preparation of maintenance budget with annual shutdown plan budget.
Monitor and control utility operation and its maintenance and ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.00 LPA
Maintenance Engineer Mechanical - 01
Education : ITI / Diploma Mechanical / BE Mechanical
Experience : Min 2 Years
Salary : upto 3.00 LPA
Job Responsibility:
Preventive maintenance and Breakdown Maintenance of All Machine
To make Monthly,Yearly Preventive maintenance Plan all Machine as per the schedule.
To make maintenance of Power Press, Milling Machine, Cutting Machine
To make overall maintenance of CNC , VMC Machine
To do the Maintenance of Hass, AMS Make Machine
To Replace LM Guide, Spindle, Ball Screw, Regulating Wheel.
To do the maintenance CNC turning, Gedee Weiler
To Replace the Cylinder Seal, Hyd. Pump Seal, Pneumatic Cylinder
To do the maintenance of SPM machine like Wet end, End touch, Induction m/c.
Doing necessary arrangements for the machine parts as per required situations
Followed 1S, 2S and TPM Process during working
Maintenance for Utility section - Compressors, Electric reading, on Monthly basis
To make Breakdown Reports, PM Reports, Check sheet of Machine.
To maintain the records as per (ISO) MTBF, MTTR
Installation of new machine
Job Location : Waluj MIDC , Aurangabad
for More details call on 9765567699
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
5.00 LPA TO 6.00 LPA
Job Description
Project Name RE-60 MAXIMA
Department: TOOL ROOM
Designation: ENGINEER
EXP. REQ. 5 - 6 YRS
Qualification: DIPLOMA
Place: -3K Aurangabad
Job Skill required:
1 KNOWLEDGE ABOUT TPM, ISO, OHSAS & IATF.
2 KNOWLEDGE ABOUT VIBRATION, WELDING FIXTURE MAINTENANCE.
3 KNOWLEDGE ABOUT INJECTION MOULDING.
Roles and responsibilities:
1 To follow the instructions given by respective HOD.
2 Maintain mould history card & ...
7 Opening(s)
2.0 Year(s) To 6.0 Year(s)
1.80 LPA TO 2.30 LPA
Post :
1.Maintenance Engineer Electrical - 04
2. Maintenance Engineer Mechanical - 03
Education : ITI / Diploma Mechanical / Electrical
Job Responsibility:
Preventive maintenance and Breakdown Maintenance of All Machine
To make Monthly,Yearly Preventive maintenance Plan all Machine as per the schedule.
To make maintenance of Power Press, Milling Machine, Cutting Machine
To make overall maintenance of VMC Machine
To do the Maintenance of Hass, AMS Make Machine
To Replace LM Guide, Spindle, Ball Screw, Regulating Wheel.
To do the maintenance CNC turning, Gedee Weiler
To Replace the Cylinder Seal, Hyd. Pump Seal, Pneumatic Cylinder
To do the maintenance of SPM machine like Wet end, End touch, Induction m/c.
Doing necessary arrangements for the machine parts as per required situations
Followed 1S, 2S and TPM Process during working
Maintenance for Utility section - Compressors, Electric reading, on Monthly basis
To make Breakdown Reports, PM Reports, Check sheet of Machine.
To maintain the records as per (ISO) MTBF, MTTR
Installation of new machine
Job Location : Nandigaon Village, Kothur Mandal Mahboobnagar - Hyderabad
For More details call on 9765567699
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 3.00 LPA
RESPONSIBILITY:-
Maintain TPM activity for PM pillar.
Preventive maintenance as per plan.
Attend all types breakdown in shift.
Why –why analysis on each breakdown.
Kaizen to improve MTTR, MTBF, Energy saving and Cost saving Kaizen.
PM and TBM improvement as per analysis of breakdown history.
Action taking on abnormality found during PM
Trouble shooting in all types of ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
800000.00 LPA TO 1200000.00 LPA
Job Profile :
Should Have Knowledge About Utility Maintenance .
Should Have Knowledge about planning & monitoring Budget & Costing .
Should have handle tracking daily .
4 Breakdown analysis-MTTR/MTBF, WHY- WHY analysis, 8 D reports. Breakdowns,
Implementing preventive maintenance programs to improve the efficiency of the system or the equipment.
Monitoring Energy consumption PNG & ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
8.00 LPA TO 12.00 LPA
Position: Asst. Manager/Manager - Maintenance
Location: Howrah - Kolkata
Experience: 10 - 12 Years
Industries: Wire
Responsibilities:
Responsible for Routine, Preventive & Breakdown maintenance of Plant machinery, Air Compressors, Cooling Towers, Pumps, Gear Boxes, Water, RO&DM water Plant, Pneumatic & Hydraulic equipment’s,
Chillers & AHU ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
8.00 LPA TO 12.00 LPA
Position: Asst. Manager/Manager - Maintenance
Location: Silvassa
Experience: 10 - 12 Years
Industries: Wire
Responsibilities:
Responsible for Routine, Preventive & Breakdown maintenance of Plant machinery, Air Compressors, Cooling Towers, Pumps, Gear Boxes, Water, RO&DM water Plant, Pneumatic & Hydraulic equipment’s,
Chillers & AHU ,ETP & ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
3.60 LPA TO 4.80 LPA
Position: Sr. Engineer/Manager -Maintenance
Location: Dadra
Experience: 5- 8 Years
Industries: Wire
Responsibilities:
Responsible for Routine, Preventive & Breakdown maintenance of Plant machinery, Air Compressors, Nitrogen generation Plants, Cooling Towers,Pumps, Gear Boxes, Water, RO&DM water Plant, Pneumatic& Hydraulicequipment’s, Chillers & AHU , ETP& STP Plant
Hands on ...