3 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
JOB DESCRIPTION:
Monitor and control all running equipment parameters following prudent operating practice.
Maintain and update station operation records and prepare all required reports on plant operation.
Direct supervise the operations and maintenance personnel assigned to the shift on day to day activities of the plant.
Monitor and interpret plant operating data and render ...
1 Opening(s)
0 To 5.0 Year(s)
1.00 LPA TO 8.00 LPA
3 to 6 years experience in digitization and detail engineering of Steel plant or Oil and Gas or Pharmaceutical or Gas power plant.This requirement is on three different tools.1) Autodesk Plant 3D (P3D)2.) Revit Structures3.) InventorAuto desk Plant 3D:
Existing Working experience on Plant 3D. Minimum 3 years
Knowledge on P&ID
Knowledge on Piping ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 3.60 LPA
The technical assistant will be position in india, based in the Power Plant office. A key resource to the Company team, the technical assistant will provide technical support to COO in the running plants & Also in the ongoing/upcoming projects.Job responsibilities include, among others, to summarize, identity and classify the ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
I. Summary
Operate and monitor all equipment on the Boilers, Turbine/Generators, Steam System, and Water System. Perform all the duties in the control room.. Maintain proper water chemistry. Perform other duties as outlined by supervisor or lead person and relieve boiler operator and fuel pusher during break periods.
II. Duties and Responsibilities
To ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
I. Summary
Operate and monitor all equipment on the Boilers, Turbine/Generators, Steam System, and Water System. Perform all the duties in the control room.. Maintain proper water chemistry. Perform other duties as outlined by supervisor or lead person and relieve boiler operator and fuel pusher during break periods.
II. Duties and Responsibilities
To ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
I. Summary
Operate and monitor all equipment on the Boilers, Turbine/Generators, Steam System, and Water System. Perform all the duties in the control room.. Maintain proper water chemistry. Perform other duties as outlined by supervisor or lead person and relieve boiler operator and fuel pusher during break periods.
II. Duties and Responsibilities
To ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
0.00 LPA TO 15.00 LPA
Requirements
• A minimum of 8 years’ experience in conducting steam trap surveys, trap management services, steam & condensate accessories sales in Oil & Gas, Petro-chemical, Chemical, Fertilizer, Power Industry.
• Well familiar with the instruments used in the field of trap testing – Ultrasonic Leak Detector, IR Temperature Sensor.
• Skilled in ...
1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
12.00 LPA TO 15.00 LPA
Plant Capacity:20Mw 110tph
Design a plan of action & review mechanism to achieve targeted operation parameters- Cost Optimization in R&M and O&M activities- Ensure start up and shutdown procedures are meticulously followed- Trip and failure analysis and take preventive action- Review and update Manuals/ SOPs of O&M, Quality, Safety etc., and ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
40.00 LPA TO 50.00 LPA
Similar Industry
Min Procurement value 1000 CR or above
CAPEX
PowerPlant/Manufacturing Industry
Description:
Responsibilities
Develop, lead and execute purchasing strategies
Track and report key functional metrics to reduce expenses and improve effectiveness
Craft negotiation strategies and close deals with optimal terms
Partner with stakeholders to ensure clear requirements documentation
Forecast price and market trends to identify changes of balance in ...
2 Opening(s)
3.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 5.00 LPA
Target for zero unit trips on account of human error. This is to be ensured by proactive condition monitoring, timely reporting and escalation of abnormalities and issues. Maintain critical plant and product parameter with range with uninterrupted supply of steam and power
To identify bottle necks in CPP and resolve them ...