5 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.50 LPA TO 5.00 LPA
Mega Walkin Interview for Engineer/Sr Engineer Mechanical Maintenance SMS(EAF/LRF) for Reputed Integrated Steel Plant at Orissa Location
Checking EAF hydraulic operations by maintaining good quality oil by keeping track through samples.
* Maintenance of Roof Gantry movement, Roof lifting unit, EAF Tilting, EAF locking, EBT M/C PM for
smooth operation, EBT Slag cutter ...
5 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.00 LPA
Walk in Interview for Shift Incharge mechanical maintenance for sponge iron for reputed integrated steel plant at Orissa Location.
Lead the total Mechanical maintenance team of TPD sponge iron plant for the maintenance of various equipments and machineries used in the plant which includes 100TPD Kiln, Cooler, screw compressors, lobe compressors, ...
1 Opening(s)
18.0 Year(s) To 25.0 Year(s)
25.00 LPA TO 30.00 LPA
We Are Currently looking for Project Head for reputed Steel plant at ORISSA Location.
commissioning of following Projects
Working as Project Lead blast furnace,SINTER PLANT
F proper, cast house, Stoves,
Slag granulation plant, Gas cleaning plant, TRT, Coal injection plant, water & utility system, AC and
ventilation systems, Electrical & instrumentation works, CH FE system and ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.80 LPA TO 5.00 LPA
Ensure the Physical & Chemical Quality.
3) SMS Stock yard visiting for Dispatch and Physical Supervision
4) To ensure the inspection & testing of all Raw Materials related to.
5) To ensure the identification traceability of products with respect to heat, grade ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
2.00 LPA TO 2.00 LPA
Urgent Requirement Lab Technician pipe division for reputed steel plant at Raipur location.
KNOWN THE ALL QUALITY EFFECT AND INSPECTION IN pipe Strong knowledge and understanding about all chemical and physical analysis of all mineral & metals.Responsible for all shift activities,Work experience in Wet chemical and instrumental analysis of Metal, Ores, ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 2.50 LPA
1st class Boiler Operator:
Responsible for operation of Boiler,HRSG (Heat Recovery Steam generation)DM/ RO Plant Fuel handling system,Boiler feed water system including de-aerator operations Steam turbines and steam networks Responsible for safe shut down and start-up of boilers & boiler auxiliaries Handing over of equipment for maintenance & inspection and taking over ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 3.60 LPA
KNOWN THE ALL QUALITY EFFECT AND INSPECTION IN WIRE Strong knowledge and understanding about all chemical and physical analysis of all mineral & metals.Responsible for all shift activities,Work experience in Wet chemical and instrumental analysis of Metal, Ores, and other materials. Calibration and service contract of laboratory Equipment,Analysis of slag ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.00 LPA
1st class Boiler Operator:
Responsible for operation of Boiler,HRSG (Heat Recovery Steam generation)DM/ RO Plant Fuel handling system,Boiler feed water system including de-aerator operations Steam turbines and steam networks Responsible for safe shut down and start-up of boilers & boiler auxiliaries Handing over of equipment for maintenance & inspection and taking over ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...