95 Job openings found

2 Opening(s)
2.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 5.00 LPA
1) Hands on experience on ERP2) Responsible for WIP Inventory control3) Responsible for preparing monthly production plan 4) Need to coordinate with each department related with Planning work 5) Prepare dispatch plan & execution   1) Hands on experience on ERP2) Responsible for WIP Inventory control3) Responsible for preparing monthly production plan4) ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
2.40 LPA TO 3.00 LPA
Job description   Shift Engineer Male 1 5 to 7 Ci pet/Any Graduate Armels Chairs , Premium Cafe Chair , High Back Chair. Job Responsibilities are as follows-. To take charge from previous shift in charge. Take a round on each machine and understand the feedback from last shift. To confirm daily operator availability with shift supervisor, understand the absenteeism ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 3.00 LPA
Hiring for PPC Engineer in Aurangabad   Education: BE Electronic / BE Electrical   Gender: Female    Experience: Min 1 Years in Production / Production Planning   JOB PROFILE:  MANUFACTURING   PLANNING  •Prepare & monitor - monthly & daily assembly production as well as dispatch plan as per customer schedule/coverage •Prepare & monitor - monthly & daily Cable cutting & wire harness production/supply plan as per assembly requirement  •Co-ordinate production through various departments/sections & ensure that production targets are achieved with regards to both quantity and quality •Coordinate with procurement colleagues for availability of child parts material required for daily production plan & Investigate/solve problems resulting from material shortages, however caused. •Review & follow up critical child part material shortages require for daily production lines with logistics/store /quality department. •Perform manufacturing planning function in CFT of new projects & ensure system support for mapping the process in the system for in-house & outsource products •Prepare monthly production variance report and highlight to all concern  CUSTOMER LOGISTIC PLANNING  •Ensure 100% customer (OEM / OES / Aftermarket) schedule compliance for the month. •Responsible for achieving 100% OEM / OES customer service level for the month •Taking follow-up with packing department for OTD supplies to customer •Prepare customer logistic performance report ( AFP Vs Actual sale – variance details, customer wise delivery performance report, schedule compliance report etc) INVENTORY CONTROL  PLANNING •Taking care of complete Kanban (B & C class components) &A class component commissioning activity for assembly line to keep the control on WIP of bought-out and in-house manufactured components. •Ensure / take action decided to minimize direct material inventory (Raw material / WIP / imports / FG) •Calculate next 4 month import child parts material procurement planning & give trigger based on the same to purchase. •Establish procedures and supervises the annual physical inventory   Facility : Bus & Cateen Available   Job Location: Aurangabad MIDC    For More details call on 9765567509 
1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
7.00 LPA TO 8.00 LPA
Role: Batch Manufacturing Designation: Executive/Sr. Executive Cost Center (E-Mis)*:Reporting Manager Role: Plant Head No. of Reportees: Nil Role: Key Job responsibilities:1) 3-4 years of prior experience in Beauty and Personal Care Manufacturing (e.g., especiallyShampoo, cream, lotion, conditioner etc.).2) Thorough understanding of batch manufacturing process with knowledge of batch makingsequence, control points and critical ...
1 Opening(s)
10.0 Year(s) To 18.0 Year(s)
12.00 LPA TO 16.00 LPA
Job Title: Production Head – Fabrication Manufacturing Location: Pune Department: Production & Operations Experience Required: 10–18 Years (Minimum 5+ years in leadership role) Job Purpose To lead, plan, and oversee the entire fabrication production operations ensuring timely delivery, quality adherence, cost efficiency, workforce management, and continuous improvement of manufacturing processes. well conversant knowledge  about ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 5.00 LPA
Transport-JV Posting, Monthly WIP reconciliation with plant, GSTR-1 return working, GSTR-3B Return working, Vendor reconciliation, Service bill Posting, Job work return, Cash flow statement, Scrap invoicing, Bank Payment, Journal, F&F, Stipend/Salary, Contractors Ledger Reconciliation, Journal accounting, Annual Return- GSTR-9, GSTR-9C working Also good experience in SAP Working in GST
1 Opening(s)
10.0 Year(s) To 25.0 Year(s)
12.00 LPA TO 15.00 LPA
(Primary deliverables of role and its scope) KPIs (Achievement of Production Plan vs. Actual)Dimensions (What is the span of the role) Key Roles/Deliverables To make daily planning based on Customer orders. WIP Control at all stage Review manpower requirement & arrange as per production plan. Coordinate with the Die Maintenance team for ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
15.00 LPA TO 15.00 LPA
Job Title: Factory Accounts ManagerLocation: Kundaim GoaDepartment: Finance & AccountsReporting To: Finance Head at HO / Plant Head at PlantJob Summary:The Factory Accounts Manager is responsible for managing all accounting, costing, financial reporting, inventory control, and compliance activities at the factory level. The role ensures accurate cost tracking, control over ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 9.00 LPA
A Finance Manager for a fabrication plant is responsible for overseeing all financial operations, cost accounting, and inventory management at the manufacturing facility. This role combines high-level financial analysis with operational business partnering to drive cost-saving initiatives, optimize working capital, and ensure compliance with statutory and internal controls. The position requires ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
A Planning Coordinator in a tower manufacturing company (e.g., transmission towers, telecom towers) acts as the bridge between sales orders, material availability, and shop floor production. They create, monitor, and adjust production schedules to ensure towers are fabricated, galvanized, and delivered on time, minimizing downtime and maximizing capacity.      Key Responsibilities Production Planning & ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile