236 Job openings found

1 Opening(s)
1.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.40 LPA
Seeking a challenging position, in the area of administration, Front & Back office support where we can utilize your expertise and Experience in Front office, Office Administration & Sales Coordination Post: Front Back Office Admin Experience : Min: 1 Year in Customer Support, Admin  Salary: up to 20,000/- PM Role & Responsibilities Manage all the Administrative activities in Office Premises Take feedback of filed Sale & Marketing Team. Calling to customers for new Project plans & Maintain database of prospective Customer Support for all marketing/digital marketing activities. Suggest the plan as per need for customers. Giving quotation Understand client’s Requirement & Suggest current Project Market research as per requirement of demographic & geographic criteria Email Marketing/campaigns and follow-ups. Social Media Design, build and maintain social media presence for user engagement. Giving a presentation to customers & counseling Prepare Bank/finance documentation of customer & Coordinate with Bankers Maintain all record Skill: ...
3 Opening(s)
0 To 1.0 Year(s)
0.00 LPA TO 2.40 LPA
Urgent Required @Electricals & Electronics Company Post: Hr Officer Female Qualification: MBA Officer: 03 Posts Fresher’s Experience: Fresher Salary: Rs. 17000/-   Location: Aurangabad Bus & Canteen facility available Paradise Placement Consultancy“Sheetal Capital” Second Floor, Shop.No.11, Opp. YSK Hospital, Chistiya Chowk, N-5 , CIDCO, Aurangabad - 431005.Maharashtra Email: career@paradiseplacement.co.in For more details call on 9765567699
3 Opening(s)
0 To 3.0 Year(s)
2.30 LPA TO 3.60 LPA
Urgent Required @Electricals & Electronics Company Post: Hr Officer & Senior Officer Female Qualification: MBA Officer: 01 Posts Fresher’s Experience: Fresher Salary: Rs. 15000/- 2. Senior Officer 02 Post Experience: 1 to 3 yrs in Mfg Industries Salary: Depends on the interview & Current Salary Location: Aurangabad Bus & Canteen facility available Paradise Placement Consultancy“Sheetal Capital” Second Floor, Shop.No.11, Opp. YSK ...
1 Opening(s)
1.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 3.00 LPA
  Hiring for Maintenance Engineer in Ahmednagar   Post: Maintenance Engineer Mechanical   Company profile: Company was started in 1991 with one power press serving kinetic Engineering with pressed components in a 1500 sq. feet. press shop in Ahmednagar, Maharashtra. Gradually the company expanded its customer base to include Electrical Switchgear industries. It was in the year 2004, that the ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.40 LPA
Post: Production Supervisor / Engineer Company Profile: was started in 1991 with one power press serving with pressed components in a 1500 sq. feet. press shop in Ahmednagar, Maharashtra.  Gradually the company expanded its customer base to include Electrical Switchgear industries.   It was in the year 2004, that the company expanded its product range to ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
0.00 LPA TO 2.40 LPA
Client Info:  The Company has gained immense expertise in supplying & trading of Mild steel, carbon steel, alloy steel etc. The supplier company is located in Mumbai, Maharashtra and is one of the leading sellers of listed products. Buy Mild steel, carbon steel, alloy steel in bulk from us for the ...
10 Opening(s)
5.0 Year(s) To 8.0 Year(s)
2.40 LPA TO 3.00 LPA
Job Profile:   Maintenance of galvanizing line. Maintenance of Maintenance of D.C. machines (up to 1600 KW DC motor.)  Maintenance of Maintenance of A.C motor (2500 KW AC motor.)  Maintenance of DC & AC Drives, power & auxiliary panels.  Maintenance of roll grinding machine Attending Breakdown maintenance & shutdown maintenance. Maintaining Safety aspects & House Keeping of the line. Maintenance of crane. Making technical Specifications and technology appraisal for plant equipment and utilities. Maintenance of Ac Drive, Dc Drive like ABB, Allen Bradley, Siemens micro Master Drive, Tele mechanique Drive BRM & WRM Electrical Maintenance Successfully completed BAR MILL Project Erection & commissioning of MCC,PCC, Transformers Drives Control wiring from RIO to Field - Proxy, HMD and solenoid valves..  Did the communication wiring & Control wiring.                                                                              MCC Control wiring & RIO'S Termination & Cabling  AC motors installation & maintenance. Encoders Cabling & Termination  OS Internal/External wiring Wiring of Siemens PLC S7-400 Handled wiring of field devices like control valves, flow meters. Looked after power cable laying & termination for power distribution panels (PCC & MCC), motors, transformers, Ac drives and HT panels. And control cables for PLC, RIO'S and various field equipment Coordinated with SIEMENS & MORGAN for Commissioning of Bar Rod Mill       Hydraulic and Lubrications motor maintenance EOT cranes & Magnetic cranes, Electrical maintenance & Troubleshooting Job Location: Chitegaon MIDC, Aurangabad Maharashtra   For more details call on 7249840333 / 9765567506   Send CV on career@paradiseplacement.co.in  
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Post: Maintenance Shift In charge    Education: DEE / BE Electrical    Experience: Min 6 Years in Rolling Mill / Steel Industry   Job Profile: Working in a general shift, make daily job planning, manpower planning as per rolling section. Responsible for doing pm-1(preventive maintenance) jobs .shift schedule and daily checklist follow-up, Responsible for Electrical & Automation Maintenance of 600-meter long HAPL Line consist of Entry section, RCM Welder,6-HI Cold / Hot Rolling Mill, Furnace, Scale Breaker, Shot- Blaster, Pickling, Entry-Mill & Exit Loppers & exit Section. Responsible for handling all maintenance related activities of ABB PLC's,AC Drives,AC Motors and DCS 800xA System and LT and HT switch Gears used in the plant  Knowledge in logic solving in control panels & various interlocking schemes required for automation and analyzing all drawings related to automation & control systems. Instrumental in coordinating with various internal departments and contractor personnel for safe execution of shutdowns and ensuring implementation of routine/preventive/breakdown maintenance schedules of the system to increase machine uptime, equipment reliability thereby. Responsible for maintaining 5S activity & safety measures regularly To co-ordinate with the Electrical contractor for Execution, Erection, and Commissioning Basic Knowledge of Sheet CENTER GUIDE and STEERING UNIT, EDGE System provided by EMG. Knowledge of hardware Communication between Drives, PLC and HMI’s through Fiber Optic and Profibus. Knowledge of Gauge Measurement system provided by IMS used at 6 HI in Line Mill. Responsible for keeping a record of the daily power consumption, daily delay report, spare parts list of the plant. Basic Knowledge about  Control-Logix / Compact-Logix systems of Allen-Bradley PLC (Rockwell Automation). Identifying NetLinx networks for use in a Logix5000 System used for in-line Welder. Successfully  accomplished Erection, testing, Commissioning of ARP System(Acid Recovery Process To maintain records, logbook for the job carried out. Organize safety meetings & give on the Job training to my subordinates To ensure good housekeeping in the area and the shop floor. Take participate in IMS  internal audit  and prepare all supporting document To maintain a record of bypass of trip & interlock as per the procedures. Working on SAP (Plant Maintenance Module).   Job Location: Chitegaon MIDC, Aurangabad Maharashtra   For more details call on 7249840333 / 9765567506   Send CV on career@paradiseplacement.co.in
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Post: Quality Lab Chemist   Education: Bsc / Msc Chemistry   Experience: Min 5 Years in Steel Industry / Rolling Mill   Job Assignment in Lab :  • Checking the specification percentage in the coolant, measuring the oil concentration, Checking the Cl, Fe Percentage in mill Process, Inspection the Final Rolling On Mill Process.  •Checking the CGL Line Zink Bath Testing •Daily Reporting Process Control, Reporting The SOP Process •Working  In 5 ‘S’ Process   Job Assignment in CGL line:    •Checking the steel sheet, Checking Hardness HRB & VPN, Bend testing, LFQ (long farming testing), measuring the thickness & width, Defects on Sheet, Checking the Zinc Coating, Checking The I Value. •Clearing the Quality CGL Line in SAP •Reporting the SOP Process   Job Assignment In CRM Line:-   •Checking the steel sheet, Checking Defects on Sheet, Measuring the thickness & width. •Clearing the Quality CRM Line in SAP. •Reporting the SOP Process.   Water Test: PH, Alkalinity Hardness, Conductivity, Chloride,  HCN, Total NH3, Phenol, C.O.D., B.O.D.,D.O, Oil & Grease, Mlss, Mlvss, TDS, SS, Sulphaide, Phosphate. By Product: Tar Moisture, Tar Dust & Tar Fog, TI, and BI. Gas Analysis orsat apparatus CO2, CmHn, O2, CO,   CH4, and H2. Estimation of NH3, H2S, Naphtha. Coke & Coal Ash: Estimation of Coke & coal ash: SiO2, Al2O3, CaO, MgO.   Job Location: Chitegaon MIDC, Aurangabad Maharashtra   for more details call on 7249840333 / 9765567506  
1 Opening(s)
7.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 9.00 LPA
Post: Production Manager Education: BE / Diploma Experience: Min 7 Years Salary: up to 9 LPA Company Profile: endeavors to Packaging that stands out of the rest, as an example of excellence. From Paper to Boxes, our expertise encompasses the entire range of Corrugated Packaging. Uncompromising quality and commitment to customer satisfaction are the prime movers. With 25 ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile