1 Opening(s)
4.0 Year(s) To 9.0 Year(s)
5.00 LPA TO 7.50 LPA
Main Responsibilities? Executing the tendering process from vendor /contractor evaluation, floating bids, bidevaluation, techno-commercial meeting, negotiation, Preparing & awarding the Order orContract.? Complete procurement to pay Cycle for Following category of items / ServicesA. Engineering Purchase – Machine spares, PPRC pipe fitting, RO Spares Pumps & Furnitureetc.B. Electrical Purchase – ...
3 Opening(s)
10.0 Year(s) To 15.0 Year(s)
0.00 LPA TO 20.00 LPA
Position: Electrical Engineer
Location: Saudi Arabia
Experience requirement: Min 10 years
Joining Date: Immediate to 30 days
MAIN RESPONSIBILITIES
Proficient Leadership and Decision-Making Skills.
The successful candidate should be a self-starter who can work with minimal
supervision
Should be able to evaluate and prioritize work to ensure alignment with the
department's goals.
Have good written and verbal communication skills.
An acute sensitivity to safety ...
2 Opening(s)
3.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 12.00 LPA
Candidate should have passion to develop the hardware of the Product containing? 32-bit controllers, FPGA, CPLD, Logic chips, Buffer chips, Flash/EEPROM/FRAM chips?Various sensors (e.g. photocoupler, LDR, Magnetic Encoder, Temperature etc.), RFiD tags?Keypad, Relay, Solenoid, various types of LCD (Graphical, 7 segment), Thermal Printer?RS485, I2C, SPI, CAN2.0b, JTAG, USB, Wi-Fi, Ethernet, ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
Not Disclosed by Recruiter
Job Overview
As an Automation Engineer, you’ll be responsible for experts who have the knowledge and ability to design, create, develop and manage machines and systems.
Job Responsibilities:
Responsible for overall development/modification of PLC, HMI & SCADA software as per the customer / internal requirements & validation, mainly in Siemens,
Responsible for all aspects ...
3 Opening(s)
2.0 Year(s) To 4.0 Year(s)
2.16 LPA TO 2.88 LPA
EXPERIENCE OF OPERATING & MAINTENANCE OF 1000 KVA TRANSFORMER
MAINTENANCE EXPERIENCE OF HYDRAULIC & PNEUMATIC BASED MACHINES
CHECKING AND REPLACING OF POWER COMPONENTS LIKE STARTERS, RELAY, CONTROLLER OF A.C DRIVES & A.C. MOTORS
OPERATING & MAINTENANCE OF L.T. PANEL AND CONTROL PANELS.
TROUBLE SHUTTING & MAINTENANCE OF HYDRAULIC LIFT.
TROUBLE SHUTTING OF LIGHTING AND POWER CABLE FAULTS.
MAINTENANCE OF ...
3 Opening(s)
0 To 1.0 Year(s)
1.56 LPA TO 1.56 LPA
Job description
Salary : 13000 to 13000
Location : Dadra & Nagar Haveli
Electrical Operator
Male
3
0 to 1
ITI Electrician
Steel balls
Electrical profile required projects site and plant sector.testing of Transformers, Breakers, Motors and other sub-station equipment's, commission installation, LT/HT panel work, Switch yard ,Relay testing
We are looking for following electrical trainee interested in industrial projects.
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
Not Disclosed by Recruiter
Calculations of:
ü Direct Stroke Lightning Protection
ü Earthing Design
ü Bus bar Selection
ü Short Circuit Force
ü Sag Tension
ü Battery sizing
ü Capacitor bank sizing
ü Cable sizing
ü Illumination Design Calculation ( indoor & outdoor)
Preparation and Review of Drawings:
ü Single Line Diagrams
ü Protection & Metering
ü Layouts & Sections
ü Erection Key Diagram
ü Earthing Layout
ü Clearance Check ...
1 Opening(s)
4.0 Year(s) To 6.0 Year(s)
Not Disclosed by Recruiter
JOB SUMMARY:
The individual will handle the day-to-day running of the account and provide operational support to the team.S/he under moderate supervision, works within specific limits and authority on assignments of moderate complexity.
S/he will manages/coordinates Client projects from planning to completion.
Effectively executes strategies, problem-solves, and develops solid business relationships.
Provides Client service ...
4 Opening(s)
1.0 Year(s) To 10.0 Year(s)
2.40 LPA TO 3.60 LPA
Key Responsibilities
Installs power supply wiring and conduit for newly installed machines and equipment such as robots, conveyors programmable controllers, relay logic, etc.
Connects power supply to machinery and equipment and connects interface wiring between machinery and equipment
Diagnoses apparatus such as transformers, motors and light fixtures and replaces damaged or broken wiring ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.00 LPA
1. Key SLD, Protection & Metering SLD
2. Design Basis Reports
3. Sizing calculations / Equipment selection
4. System studies using ETAP
5. Protection, Synchronisation, Control & Metering scheme drawings of Generators, Transformers, Switchgear, Switchyard, Reactors and Lines
6. Networking architecture including IEC61850
7. Relay setting calculation and Parameterisation
8. Control interfaces with DDCMIS, EDMS, ECP
9. Cable ...