1 Opening(s)
4.0 Year(s) To 10.0 Year(s)
2.75 LPA TO 4.20 LPA
Maintain right and log of each ERP users
Responsible for change, creation, edition in vendor/customer master file in ERP.
Maintain licenses of ERP system, office 365 and timely payment of renewal fees.
Upgrade ERP version as and when available or ...
2 Opening(s)
10.0 Year(s) To 14.0 Year(s)
0.00 LPA TO 0.00 LPA
Profile Summary,
Prepare contract documents, including bills of quantities for REMEASURABLE / UNIT RATE CONTRACTS.
Undertake cost analysis for Construction and EPC project.
Prepare and Manage control Budget.
Prepare and manage Resource Budget (Manpower & Equipment).
Prepare Monthly Cost reports.
Forecast costs within reports – project actual cost against planned costs to provide accurate forecasts with ...
7 Opening(s)
3.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 13.00 LPA
semi qualified –
Max TCC budget – 12.5 LPA
Skills – budgeting/Forecasting (FPNA)
search within the range of (7 LPA – 11 LPA) for the below mentioned roles.
Skills Requird - Cost accounting, revenue, cash flow, balance sheet preparation, budgeting, forecasting, AR & Reconciliation with a flair of FP&A, revenue assurance, invoicing
Education Required - Bcom/Mcom/MBA/CA/ICWA/ ICWA/Inter ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.68 LPA TO 3.00 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)
Education: BE Electrical or Electronic / Electrical / Mechanical
Gender: Male
Responsibilities & Authority:
•Capacity Planning for production of particular Shop Floor
•To Monitor & do the production planning according to the customer schedule
•To Monitor the Raw Material availability as per planning
•To Monitor monthly & weakly production planning
•To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan.
•To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor
•To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan.
•To prepare the dispatch plan as per customer schedule.
•To release the dispatch plan to production dept.
•To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan
•To release a kitting plan to the store's department in accordance with the production plan.
•To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date.
•To communicate with the design department about the output of the process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production.
•To maintain the record of the date and production order from which each change in engineering specifications is implemented in production.
•To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.
•To release production orders in SAP as per plan and provide a cutting label for production.
•To ensure timely confirmation of production in SAP.
•To ensure that FG stocks in BSR coincide with that in SAP system.
•To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on a daily basis
•To ensure that packing of FG is done within shift time.
•To ensure that daily production data update on display board and also update it in softcopy.
•To Monitor & do measurement Of Production Objectives
•To Work in PP & MM module of SAP
•To Maintain the stock in SAP
•To Match the physical raw material stock & SAP stock
•Play an important role in WIP (STOCK) as coordinator for production & account dept.
•Monitor Schedule Vs. Compliance of production
•To take responsibility as an associate member in KK pillar.
•Monitoring Daily Attendance & data of operator, also coordinate with HR dept. for the same.
•OEE monitoring.
•Plan v/s Actual monitoring.
•Scrap monitoring.
•Monitoring TPM activity of production department.
•Monitoring ISO & TS activity of production department.
•To coordinate with purchase, Store & account dept. for new material requirement
•To communicate with supervisors & line leaders of the respective section (ACC, LPC, ASSEMBLY)
•To maintain KAIZEN & coordinate with QMS Dept. for the same
•To prepare MRM Presentation
•To make stage wise identification
Job Location: Shendra MIDC, Aurangabad
for more details call on 7249840222 / 9765567505
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.60 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)
Education: BE Electrical or Electronic
Gender: Female
Responsibilities & Authority:
•Capacity Planning for production of particular Shop Floor
•To Monitor & do the production planning according to the customer schedule
•To Monitor the Raw Material availability as per planning
•To Monitor monthly & weakly production planning
•To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan.
•To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor
•To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan.
•To prepare the dispatch plan as per customer schedule.
•To release the dispatch plan to production dept.
•To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan
•To release a kitting plan to the store's department in accordance with the production plan.
•To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date.
•To communicate with the design department about the output of process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production.
•To maintain the record of the date and production order from which each change in engineering specifications is implemented in production.
•To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.
•To release production orders in SAP as per plan and provide a cutting label for production.
•To ensure timely confirmation of production in SAP.
•To ensure that FG stocks in BSR coincide with that in SAP system.
•To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on the daily basis
•To ensure that packing of FG is done within shift time.
•To ensure that daily production data update on display board and also update it in softcopy.
•To Monitor & do measurement Of Production Objectives
•To Work in PP & MM module of SAP
•To Maintain the stock in SAP
•To Match the physical raw material stock & SAP stock
•Play an important role in WIP (STOCK) as coordinator for production & account dept.
•Monitor Schedule Vs. Compliance of production
•To take responsibility as associate member in KK pillar.
•Monitoring Daily Attendance & data of operator, also co-ordinate with HR dept. for the same.
•OEE monitoring.
•Plan v/s Actual monitoring.
•Scrap monitoring.
•Monitoring TPM activity of production department.
•Monitoring ISO & TS activity of production department.
•To coordinate with purchase , Store & account dept. for new material requirement
•To communicate with supervisors & line leaders of respective section (ACC , LPC, ASSEMBLY)
•To maintain KAIZEN & coordinate with QMS Dept. for the same
•To prepare MRM Presentation
•To make stage wise identification
Job Location: Chitegaon MIDC , Aurangabad
for more details call on 7249840222
2 Opening(s)
5.0 Year(s) To 8.0 Year(s)
400000.00 LPA TO 600000.00 LPA
JOB DESCRIPTION
JOB TITLE
Sr. Engineer/AM-PPC & SCM
EXPERIENCE
BE(Mech) with 5- 8 yrs
REPORTING TO
Senior Manager-PPC & SCM
PREFERRED INDUCTRIES
Automotive components Manufacturing(Machining Background)
RESPONSIBILITIES
Releasing the Production plan, planning for materials, co-ordination with Production & Warehouse for delivering product on time to the Customer
Implementing key Planning activities like MRP, working to reduce excess and optimize revenue and ...
1 Opening(s)
0 To 1.0 Year(s)
1.00 LPA TO 1.20 LPA
Job Description:
Material inward
Material inward & check the physical quantity
Finishing job work update in system
Plant II material weight verify
Plant II material issue as per issue slip
Switch, compression & deflashing material issue as per issue slip
Issue in system
Give WIP Acknowledge & check material physically
Avoid stock mismatches in store
GRN Preparation
Responsible for proper material ...
1 Opening(s)
0 To 1.0 Year(s)
1.20 LPA TO 1.44 LPA
Material inward
Material inward & check the physical quantity
Finishing job work update in system
Plant II material weight verify
Plant II material issue as per issue slip
Switch, compression & deflashing material issue as per issue slip
Issue in system
Give WIP Acknowledge & check material physically
Avoid stock mismatches in store
GRN Preparation
Responsible for proper material handling
Monthly ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.20 LPA TO 1.44 LPA
Material inward
Material inward & check the physical quantity
Finishing job work update in system
Plant II material weight verify
Plant II material issue as per issue slip
Switch, compression & deflashing material issue as per issue slip
Issue in system
Give WIP Acknowledge & check material physically
Avoid stock mismatches in store
GRN Preparation
Responsible for proper material handling
Monthly ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 2.40 LPA
Post: Store Officer
Education: Any Graduate / BE / Diploma
Salary: up to 2.40 LPA
JD:
Material inward
Material inward & check the physical quantity
Finishing job work update in system
Plant II material weight verify
Plant II material issue as per issue slip
Switch, compression & deflashing material issue as per issue slip
Issue in system
Give WIP Acknowledge & check ...