1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
20.00 LPA TO 25.00 LPA
Position: AGM - Engineering (Jhagadia)
Location: Jhagadia
Experience: 15 - 20 Years
Industries: Chemical
Responsibilities:
Lead preventive, predictive, and breakdown maintenance of all mechanical, electrical, and instrumentation systems.
Ensure minimal downtime and optimal equipment availability for production.
Implement and maintain a robust Computerized Maintenance Management System (CMMS).
Drive reliability ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
20.00 LPA TO 25.00 LPA
Position: AGM - Engineering (Sachin)
Location: Surat - Sachin
Experience: 15 - 20 Years
Industries: Chemical
Responsibilities:
Lead preventive, predictive, and breakdown maintenance of all mechanical, electrical, and instrumentation systems.
Ensure minimal downtime and optimal equipment availability for production.
Implement and maintain a robust Computerized Maintenance Management System ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
12.00 LPA TO 18.00 LPA
An Electrical Shift Incharge (SID) / Manager manages daily electrical operations, maintenance, and safety compliance in industrial or power plants. Responsibilities include overseeing technicians, troubleshooting breakdowns, ensuring adherence to safety regulations (HT/LT systems), managing utility operations (water treatment, etc.), and optimizing energy consumption during their shift.
Key Responsibilities
Operations & Maintenance: Monitor, maintain, and ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
9.00 LPA TO 12.00 LPA
The QMS Manager in PCB manufacturing is responsible for establishing, implementing, maintaining, and continuously improving the company’s Quality Management System (QMS). They ensure full compliance with international standards (ISO 9001, IATF 16949, AS9100), regulatory requirements, and customer-specific demands to ensure high-quality, defect-free PCB products.
Key Responsibilities
QMS Development & Compliance: Lead the ...
1 Opening(s)
4.0 Year(s) To 10.0 Year(s)
0.00 LPA TO 0.00 LPA
Job Description – Operational Risk Resource -1 positions
Location – Airoli, Navi Mumbai
Experience – Minimum 4-10 years
Budget is negotiable.
Role:
Self Control testing to be conducted, as per Risk Control Matrices assigned to units as per agreed plan and tracking & timely closure of open issues/ actions and risk acceptances of the assigned ...
2 Opening(s)
7.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
Job Title: WPR - ElectricalExperience: Minimum 5 years of Aramco Experience
Location:Saudi Arabia, Dammam & Project location will be in Eastern Region
Job Responsibilities:
· Obtain and manage work permits for electrical activities at substations and tower sites
· Ensure compliance with project safety procedures and permit-to-work systems
· Conduct Job Safety Analysis (JSA) and lead task-specific ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.80 LPA
JOB DESCRIPTION
17.04.26
131209
HPS/2026/326
Quality Control Engineer
Male
1
3 to 7
DME/B.E Mech
8 to 10 Hrs
Job Title: Quality Control Engineer
Reference Code: HPS/2026/326 Industry: Metal Casting / Foundry Location: Valwada (Near Karambele Railway Station) Employment Type: Full-time
Job Summary:
We are seeking a detail-oriented and experienced Quality Control Engineer to ensure that all products in the metal casting/foundry process ...
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
A Real Estate QC Engineer ensures construction quality, safety, and compliance with standards through inspections and testing of civil, structural, and finishing works. They prepare checklists, manage documentation (ISO), and oversee material testing. Common requirements include a BE in Civil Engineering and 5–8 years of experience.
Key Responsibilities
Quality Inspections: Conduct regular inspections of ...
1 Opening(s)
7.0 Year(s) To 10.0 Year(s)
11.00 LPA TO 12.00 LPA
Position: QA Manager
Location: Bhilad nearby Vapi
Experience: 7 - 10 Years
Industries: Cosmetic
Responsibilities:
Quality System Oversight
Develop, implement, and maintain GMP (Good Manufacturing Practices) and ISO standards for cosmetics production.
Ensure compliance with regulatory requirements (FDA, EU Cosmetics Regulation, BIS in India, etc.).
Raw Material & Supplier Quality Control
Establish and ...
2 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.00 LPA TO 3.50 LPA
Key Responsibilities
Inspection & Testing: Perform dimensional checks on parts/assemblies, verify set-ups, and conduct in-process and final audits.
Problem Solving: Identify root causes of quality issues, manage internal rejections, and drive corrective/preventive actions (CAPA).
Process Control: Develop/implement quality protocols, monitor production, and manage Statistical Process Control (SPC).
Documentation: Generate reports, maintain quality records, review blueprints/BOMs, and update the Quality Management ...