1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.50 LPA
Overall line responsibility from production to packaging• Start / Stop the machine and utility equipment.• Performs process setting & monitoring.• Monitor Material control (weight distribution, regrind levels, watch tail lengths, etc.)• Performs regular quality control throughout the shift and visual quality checks• Check & monitor process parameters like machine cycle ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
13.00 LPA TO 15.00 LPA
Position Title: Quality Head – Profile Business
No. of Position: 1
Job Location: Kanpur, Uttar Pradesh
Designation: Manager
Gender: Male Age: 30-40 Years
Total Experience Required: 10-15 years
Travel Required: Yes
Reporting to: General Manager
Education: PGD -PPT CIPET/BE/B.Tech in Mechanical Engineering / Production Engineering/Manufacturing Technology
Key Responsibilities:
Ensure the quality parameters of incoming material as per the CPL quality ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Sr. No
Details
1
Capex:
1) Collaborate with Users & Buyers to create & implement procurement strategies for CAPEX purchases and categories of spend.
2) Should be responsible for Capex procurement of (To Be Defined)
2
OPEX Purchase:
1) Arranging timely procurement and supply of all Engineering consumables, boiler fuel & utility consumables and spares of specified quantity ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Sr. No
Details
1
Capex:
1) Collaborate with Users & Buyers to create & implement procurement strategies for CAPEX purchases and categories of spend.
2) Should be responsible for Capex procurement of (To Be Defined)
2
OPEX Purchase:
1) Arranging timely procurement and supply of all Engineering consumables, boiler fuel & utility consumables and spares of specified quantity ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Sr. No
Details
1
Capex:
1) Collaborate with Users & Buyers to create & implement procurement strategies for CAPEX purchases and categories of spend.
2) Should be responsible for Capex procurement of (To Be Defined)
2
OPEX Purchase:
1) Arranging timely procurement and supply of all Engineering consumables, boiler fuel & utility consumables and spares of specified quantity ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
15.00 LPA TO 18.00 LPA
Unit Solar Power BusinessFunction Quality
The Field Quality Manager will be fully responsible to ensure QA in entire construction site during the project execution including material supply quality (at site) & execution quality.On Site FQA representatives will report to FQ Manager for day-to-day Quality compliance & issues captured. He will be responsible for ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 7.20 LPA
Overall Job Responsibility
1. Ensuring Excavation and development of Mine as per Excavation (annual/ quarterly/ monthly/ weekly) plan. Coordinate for drilling and blasting as per requirements. Comply with all the requirements of mining as per MMDR Act, Mines Act, Rules & MMR 1961 Ensure excavation of OB & ROM as per ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
5.00 LPA TO 6.00 LPA
Roles and Responsibilities
01.01.25
HPS/2025/24
Quality Asstt
F
1
1 to 2
B.Com/DME/B.Sc
Ensure safe working condition of all employees. If any unsafe activity observed immediately contact with production head and safety head.
2.To check all production as per standard.
of the product should be as per quality requirement.
To test daily production as per lab testing standard.
To ensure no production ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
18.00 LPA TO 24.00 LPA
Job Description
Job Responsibility :
Ensure all production teams have effective resources and are working to the standard processes defined in the company.Primary responsible for developing and promoting positive labor relations in Union and non-union environmentsProduce High Carbon, Rebar, Drawing grades, VHC Grades from Billet CastersPreparing, planning monthly and daily production targets.Resource ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.00 LPA
Monitoring of manufacturing related activity performed in Mfg facility.To maintain proper planning, scheduling and achievement of production with optimum utilization of resources.To preparation, review and implementation of all necessary standard operating procedure(SOP).To preparation and review of batch manufacturing record and protocol.Training given to all concern persons in their respective areas.To ...